Dachaigh › Luchd-obrach › The Matthews Group, Inc.
The Matthews Group, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir The Matthews Group, Inc. 9 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 9. Tuarastal meadhanach a chaidh a thabhann: $106,000.
A bheil The Matthews Group, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir The Matthews Group, Inc. 9 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 3 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Manager | 3 | $106,000 |
| Construction Engineer I | 2 | $74,256 |
| Senior Project Manager | 2 | $127,250 |
| Program Manager | 1 | $112,000 |
| Assistant Project Manager | 1 | $114,296 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $106,000 |
| FY2024 | 2 | $92,504 |
| FY2025 | 1 | $75,504 |
| FY2026 | 4 | $114,296 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Manager | $114,296–$120,000 Ìre II | Falls Church, VA | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Assistant Project Manager | $114,296–$120,000 Ìre II | Falls Church, VA | 3 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Senior Project Manager | $152,000–$165,000 Ìre IV | Riverdale, MD | 21 Samh 2025 | 1 Faoi 2026 | Dearbhaichte |
| Senior Project Manager | $102,500–$120,000 Ìre II | Riverdale, MD | 11 Samh 2025 | 1 Faoi 2026 | Dearbhaichte |
| Construction Engineer I | $75,504 Ìre I | Falls Church, VA | 30 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Construction Engineer I | $73,008 Ìre I | Leesburg, VA | 29 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Program Manager | $112,000–$148,000 Ìre II | Washington, DC | 12 Gearr 2024 | 12 Gibl 2024 | Dearbhaichte |
| Project Manager | $106,000–$115,003 Ìre II | Falls Church, VA | 13 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Project Manager | $106,000–$115,003 Ìre II | Arlington, VA | 12 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).