Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Medtronic, Inc. › Principal Quality Engineer

Principal Quality Engineer aig Medtronic, Inc.: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Principal Quality Engineer aig Medtronic, Inc.. Tuarastal bunasach meadhanach $123,687; leth meadhanach $120,494–$131,201.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$123,687
Leath mheadhanach nan tuarastalan$120,494–$131,201
Ceudail 10mh–90mh$117,655–$136,770

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$117,936
FY20241$117,000
FY20252$125,944
FY20264$128,824

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$124,467–$126,000
Ìre IV
Brooklyn Center, MN23 Ògmh 20269 Samh 2026Dearbhaichte
$133,182–$150,000
Ìre IV
Lafayette, CO23 Gibl 20261 Dàmh 2026Dearbhaichte
$122,907–$130,819Billerica, MA24 Samh 202517 Gibl 2026Dearbhaichte
$122,907–$130,819Billerica, MA21 Samh 202517 Gibl 2026Air a tharraing air ais
$145,142–$149,425
Ìre IV
Tempe, AZ19 Samh 20259 Faoi 2026Dearbhaichte
—
Ìre IV
Tempe, AZ25 Sult 20259 Faoi 2026Dearbhaichte
$121,347–$128,176
Ìre IV
Fridley, MN18 Màrt 202513 Sult 2025Dearbhaichte
$130,541–$145,777
Ìre IV
Northridge, CA6 Faoi 202523 Cèit 2025Dearbhaichte
$117,000–$127,959
Ìre IV
Fridley, MN11 Samh 202226 Gearr 2023Dearbhaichte, an uair sin air a tharraing air ais
$117,936–$130,980
Ìre IV
Tempe, AZ26 Dàmh 20229 Faoi 2023Dearbhaichte

Principal Quality Engineer aig gach neach-fastaidh →

Obraichean eile aig Medtronic, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).