Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Merck Sharp & Dohme LLC › Associate Director, Engineering, Development & Integration

Associate Director, Engineering, Development & Integration aig Merck Sharp & Dohme LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Associate Director, Engineering, Development & Integration aig Merck Sharp & Dohme LLC. Tuarastal bunasach meadhanach $139,600; leth meadhanach $139,464–$139,600.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$139,600
Leath mheadhanach nan tuarastalan$139,464–$139,600
Ceudail 10mh–90mh$134,362–$151,224

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$135,212
FY20252$139,600
FY20261$158,974

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$158,974–$224,100
Ìre IV
Rahway, NJ24 Gibl 20266 Iuch 2026Dearbhaichte
$139,600–$219,700
Ìre II
Fuquay Varina, NC2 Iuch 20257 Samh 2025Dearbhaichte
$139,600–$219,700
Ìre II
Fuquay Varina, NC11 Ògmh 20257 Samh 2025Dearbhaichte
$139,464–$206,200
Ìre IV
Austin, TX17 Iuch 202315 Faoi 2024Dearbhaichte
$130,960–$206,200
Ìre III
Rahway, NJ23 Ògmh 20237 Iuch 2023Dearbhaichte

Obraichean eile aig Merck Sharp & Dohme LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).