Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Meta Platforms, Inc › Construction Manager

Construction Manager aig Meta Platforms, Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Construction Manager aig Meta Platforms, Inc. Tuarastal bunasach meadhanach $151,102; leth meadhanach $151,102–$160,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$151,102
Leath mheadhanach nan tuarastalan$151,102–$160,000
Ceudail 10mh–90mh$138,441–$164,200

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$130,000
FY20253$151,102
FY20261$167,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$167,000
Ìre IV
Lebanon, IN5 Ògmh 20269 Ògmh 2026Dearbhaichte
$151,102
Ìre III
Gallatin, TN27 Lùna 202529 Lùna 2025Dearbhaichte
$160,000
Ìre IV
Rayville, LA16 Iuch 202521 Iuch 2025Dearbhaichte
$151,102
Ìre III
Gallatin, TN20 Màrt 202517 Sult 2025Dearbhaichte
$130,000
Ìre II
Gallatin, TN21 Dàmh 20227 Samh 2022Dearbhaichte

Construction Manager aig gach neach-fastaidh →

Obraichean eile aig Meta Platforms, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).