Dachaigh › Luchd-obrach › Metropolitan Government of Nashville and Davidson County
Metropolitan Government of Nashville and Davidson County: Tuarastalan H-1B agus taic bhìosa
Chuir Metropolitan Government of Nashville and Davidson County 10 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 10. Tuarastal meadhanach a chaidh a thabhann: $82,500.
A bheil Metropolitan Government of Nashville and Davidson County a’ toirt taic do bhìosaichean H-1B?
Chuir Metropolitan Government of Nashville and Davidson County 10 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 6 Gearr 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Engineer in Training | 3 | $77,958 |
| Economic and Social Research Associate | 2 | $100,000 |
| Planner 1 - Land Development | 1 | $75,000 |
| Planner 2 - Community Plans | 1 | $82,000 |
| Urban and Ecological Designer | 1 | $72,000 |
| Planner 1: Plan Review - Land Development & Design Division | 1 | $83,000 |
| Planner 2 - Project Management | 1 | $88,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 1 | $77,958 |
| FY2025 | 5 | $82,000 |
| FY2026 | 4 | $85,500 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Planner 2 - Project Management | $88,000–$92,000 Ìre I | Nashville, TN | 6 Gearr 2026 | 16 Gearr 2026 | Dearbhaichte |
| Engineer in Training | $88,046–$92,046 Ìre II | Nashville, TN | 24 Sult 2025 | 29 Sult 2025 | Dearbhaichte |
| Planner 1: Plan Review - Land Development & Design Division | $83,000–$87,000 Ìre I | Nashville, TN | 26 Ògmh 2025 | 21 Iuch 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Planner 2 - Community Plans | $82,000–$86,000 Ìre I | Nashville, TN | 3 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Urban and Ecological Designer | $72,000–$76,000 Ìre I | Nashville, TN | 9 Gibl 2025 | 28 Gibl 2025 | Dearbhaichte |
| Planner 1 - Land Development | $75,000–$79,000 Ìre I | Nashville, TN | 6 Màrt 2025 | 4 Iuch 2025 | Dearbhaichte |
| Economic and Social Research Associate | $100,000–$110,000 Ìre I | Nashville, TN | 8 Samh 2024 | 7 Cèit 2025 | Dearbhaichte |
| Economic and Social Research Associate | $100,000–$110,000 Ìre I | Nashville, TN | 1 Samh 2024 | 11 Samh 2024 | Dearbhaichte |
| Engineer in Training | $77,958–$82,958 Ìre II | Nashville, TN | 22 Cèit 2024 | 3 Ògmh 2024 | Dearbhaichte |
| Engineer in Training | $76,000–$82,000 Ìre II | Nashville, TN | 22 Lùna 2023 | 1 Sult 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).