Dachaigh › Luchd-obrach › Michael Baker International, Inc. › Civil Engineer I
Civil Engineer I aig Michael Baker International, Inc.: Tuarastalan H-1B
23 iarrtasan cumhaichean-obrach airson an dreuchd Civil Engineer I aig Michael Baker International, Inc.. Tuarastal bunasach meadhanach $87,000; leth meadhanach $79,411–$94,000.
Iarrtasan (LCAs)23
Tuarastal meadhanach a chaidh a thabhann$87,000
Leath mheadhanach nan tuarastalan$79,411–$94,000
Ceudail 10mh–90mh$76,352–$96,903
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $95,000 |
| FY2024 | 6 | $79,714 |
| FY2025 | 8 | $86,000 |
| FY2026 | 6 | $95,638 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $95,638–$123,034 Ìre III | Virginia Beach, VA | 29 Cèit 2026 | 30 Sult 2026 | Dearbhaichte |
| $80,000–$90,000 Ìre I | Moon Township, PA | 21 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $95,638–$123,034 Ìre III | Virginia Beach, VA | 21 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $97,219–$112,387 Ìre II | Baton Rouge, LA | 7 Samh 2025 | 17 Gibl 2026 | Dearbhaichte |
| $97,219–$112,387 Ìre II | Ste. 450, LA | 3 Samh 2025 | 17 Gibl 2026 | Dearbhaichte |
| $67,586–$106,472 Ìre II | Marion, IN | 27 Lùna 2025 | 26 Gearr 2026 | Dearbhaichte |
| $90,875–$130,132 Ìre II | Chicago, IL | 15 Iuch 2025 | 21 Iuch 2025 | Dearbhaichte |
| $85,000–$118,302 Ìre II | Dallas, TX | 2 Iuch 2025 | 5 Dùbh 2025 | Dearbhaichte |
| $87,000–$130,132 Ìre II | Chicago, IL | 1 Gibl 2025 | 7 Gibl 2025 | Dearbhaichte |
| $87,000–$130,132 Ìre II | Chicago, IL | 1 Gibl 2025 | 14 Lùna 2025 | Dearbhaichte |
| $78,850–$124,217 Ìre II | Dearborn, MI | 21 Màrt 2025 | 7 Sult 2025 | Dearbhaichte |
| $76,190–$118,302 Ìre II | Virginia Beach, VA | 7 Màrt 2025 | 28 Lùna 2025 | Dearbhaichte |
| $91,354–$130,810 Ìre II | Irvine, CA | 1 Dàmh 2024 | 21 Màrt 2025 | Dearbhaichte |
| $85,000–$130,814 Ìre II | Hamilton, NJ | 31 Iuch 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $93,000–$125,127 Ìre II | Ontario, CA | 26 Iuch 2024 | 1 Dàmh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| $79,428–$125,127 Ìre I | Ontario, CA | 8 Iuch 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $87,714–$135,502 Ìre II | Waltham, MA | 1 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $77,000–$113,752 Ìre II | Indianapolis, IN | 20 Gearr 2024 | 1 Màrt 2024 | Dearbhaichte |
| $80,000–$95,000 Ìre II | Louisville, KY | 28 Sult 2023 | 24 Màrt 2024 | Dearbhaichte |
| $95,000–$110,000 Ìre II | Orlando, FL | 8 Cèit 2023 | 22 Cèit 2023 | Dearbhaichte |
| $104,770–$114,990 Ìre II | Katy, TX | 21 Màrt 2023 | 10 Lùna 2023 | Dearbhaichte |
| $72,000–$85,000 Ìre II | Charleston, WV | 22 Gearr 2023 | 27 Gearr 2023 | Dearbhaichte |
| $79,394–$82,000 Ìre II | Katy, TX | 12 Lùna 2021 | 1 Dàmh 2021 | Dearbhaichte, an uair sin air a tharraing air ais |
Civil Engineer I aig gach neach-fastaidh →
Obraichean eile aig Michael Baker International, Inc.
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).