Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Michaels Stores, Inc. › Sr. Developer

Sr. Developer aig Michaels Stores, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Developer aig Michaels Stores, Inc.. Tuarastal bunasach meadhanach $145,000; leth meadhanach $141,040–$145,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$145,000
Leath mheadhanach nan tuarastalan$141,040–$145,000
Ceudail 10mh–90mh$134,416–$148,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$141,040
FY20244$145,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$145,000
Ìre II
Charlotte, NC26 Ògmh 20244 Iuch 2024Dearbhaichte
$145,000
Ìre II
Charlotte, NC21 Ògmh 20245 Lùna 2024Dearbhaichte
$150,000
Ìre IV
Irving, TX26 Màrt 20248 Gibl 2024Dearbhaichte
$130,000
Ìre IV
Irving, TX25 Dàmh 20236 Samh 2023Dearbhaichte
$141,040
Ìre IV
Irving, TX15 Gearr 202320 Gearr 2023Dearbhaichte

Sr. Developer aig gach neach-fastaidh →

Obraichean eile aig Michaels Stores, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).