Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Microsoft Corporation › Construction Project Manager

Construction Project Manager aig Microsoft Corporation: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Construction Project Manager aig Microsoft Corporation. Tuarastal bunasach meadhanach $165,000; leth meadhanach $160,000–$173,000.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$165,000
Leath mheadhanach nan tuarastalan$160,000–$173,000
Ceudail 10mh–90mh$159,933–$177,300

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20237$165,000
FY20242$169,250

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$160,000
Ìre III
Goodyear, AZ1 Dùbh 20237 Dùbh 2023Dearbhaichte
$178,500
Ìre III
San Diego, CA27 Samh 20238 Faoi 2024Dearbhaichte
$173,000
Ìre III
Leesburg, VA7 Sult 202314 Sult 2023Dearbhaichte
$162,000
Ìre III
North Liberty, IA6 Sult 202313 Sult 2023Dearbhaichte
$159,933
Ìre III
East Wenatchee, WA18 Lùna 20231 Dàmh 2023Dearbhaichte
$159,933
Ìre III
East Wennatchee, WA17 Lùna 20231 Dàmh 2023Dearbhaichte
$173,000
Ìre III
Leesburg, VA3 Lùna 202310 Lùna 2023Dearbhaichte
$165,000
Ìre III
San Antonio, TX11 Iuch 202318 Iuch 2023Dearbhaichte
$177,000
Ìre III
Santa Clara, CA26 Sult 20223 Dàmh 2022Dearbhaichte

Construction Project Manager aig gach neach-fastaidh →

Obraichean eile aig Microsoft Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).