Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Milroy Construction, Inc.

Milroy Construction, Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir Milroy Construction, Inc. 4 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 4. Tuarastal meadhanach a chaidh a thabhann: $119,590.

Iarrtasan (LCAs)4
Dearbhaichte4
Seòladh an neach-fhastaidhMountain View, CA
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$119,590
Leath mheadhanach nan tuarastalan$99,143–$147,462
Ceudail 10mh–90mh$95,118–$164,852

A bheil Milroy Construction, Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir Milroy Construction, Inc. 4 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 20 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Assistant Project Manager2$119,590
Senior Estimator & Pre-construction Manager1$176,446
Project Engineer1$92,435

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$101,379
FY20251$176,446
FY20262$115,118

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Project Engineer$92,435–$135,000
Ìre I
Mountain View, CA20 Gibl 20261 Dàmh 2026Dearbhaichte
Assistant Project Manager$137,800–$220,000
Ìre III
Mountain View, CA10 Gearr 202611 Lùna 2026Dearbhaichte
Senior Estimator & Pre-construction Manager$176,446–$215,000
Ìre IV
Mountain View, CA20 Gearr 20253 Màrt 2025Dearbhaichte
Assistant Project Manager$101,379–$135,000
Ìre II
Mountain View, CA3 Màrt 202311 Lùna 2023Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).