Dachaigh › Luchd-obrach › Milwaukee Electric Tool Corporation › Project Leader
Project Leader aig Milwaukee Electric Tool Corporation: Tuarastalan H-1B
6 iarrtasan cumhaichean-obrach airson an dreuchd Project Leader aig Milwaukee Electric Tool Corporation. Tuarastal bunasach meadhanach $126,000; leth meadhanach $123,385–$128,768.
Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$126,000
Leath mheadhanach nan tuarastalan$123,385–$128,768
Ceudail 10mh–90mh$121,424–$130,476
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $122,500 |
| FY2025 | 1 | $122,847 |
| FY2026 | 3 | $129,357 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $127,000 Ìre IV | Brookfield, WI | 19 Ògmh 2026 | 15 Dùbh 2026 | Dearbhaichte |
| $129,357 Ìre IV | Brookfield, WI | 19 Ògmh 2026 | 30 Ògmh 2026 | Dearbhaichte |
| $131,595 Ìre IV | Brookfield, WI | 23 Màrt 2026 | 2 Lùna 2026 | Dearbhaichte |
| $122,847 Ìre IV | Brookfield, WI | 4 Dùbh 2024 | 12 Gibl 2025 | Dearbhaichte |
| $120,000 Ìre IV | Brookfield, WI | 24 Faoi 2023 | 6 Gearr 2023 | Dearbhaichte |
| $125,000 Ìre IV | Brookfield, WI | 2 Dùbh 2021 | 10 Faoi 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
Project Leader aig gach neach-fastaidh →
Obraichean eile aig Milwaukee Electric Tool Corporation
- Electrical Engineer II$96,000
- Design Engineer II$93,694
- Firmware Engineer II$104,000
- Electrical Engineer I$88,234
- Senior Firmware Test Engineer$115,000
- Quality Engineer II$82,135
- Electrical Engineer$83,970
- Manager Firmware Engineering$125,000
- Motor Engineer$91,780
- Design Engineer$88,000
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).