Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Montrose Environmental Group Inc.

Montrose Environmental Group Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir Montrose Environmental Group Inc. 8 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 8. Tuarastal meadhanach a chaidh a thabhann: $67,084.

Iarrtasan (LCAs)8
Dearbhaichte8
Seòladh an neach-fhastaidhNorth Little Rock, AR
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$67,084
Leath mheadhanach nan tuarastalan$65,437–$79,289
Ceudail 10mh–90mh$65,324–$130,700

A bheil Montrose Environmental Group Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir Montrose Environmental Group Inc. 8 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 4 Màrt 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Field Project Manager3$65,437
Project Engineer I2$69,472
Senior Principal Environmental Specialist1$200,000
Staff Engineer1$67,275
Senior Project Manager (Environmental Engineer)1$101,000

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$67,275
FY20241$72,052
FY20253$65,437
FY20261$65,062

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Field Project Manager$65,062
Ìre I
Bridgeville, PA4 Màrt 202631 Màrt 2026Dearbhaichte
Field Project Manager$65,437
Ìre I
Jefferson, LA4 Ògmh 20251 Dàmh 2025Dearbhaichte
Field Project Manager$65,437
Ìre I
Jefferson, LA28 Cèit 20251 Dàmh 2025Dearbhaichte
Senior Project Manager (Environmental Engineer)$101,000
Ìre II
Santa Ana, CA9 Gibl 20253 Sult 2025Dearbhaichte
Project Engineer I$72,052
Ìre I
Sandy Springs, GA16 Gibl 20241 Dàmh 2024Dearbhaichte
Senior Principal Environmental Specialist$200,000
Ìre IV
Lake Stevens, WA20 Màrt 20231 Gibl 2023Dearbhaichte
Staff Engineer$67,275
Ìre I
Sandy Springs, GA26 Gibl 20221 Dàmh 2022Dearbhaichte, an uair sin air a tharraing air ais
Project Engineer I$66,893–$75,500
Ìre II
Sandy Springs, GA14 Gibl 20211 Dàmh 2021Dearbhaichte, an uair sin air a tharraing air ais

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).