Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Morgner Technology Management

Morgner Technology Management: Tuarastalan H-1B agus taic bhìosa

Chuir Morgner Technology Management 4 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 4. Tuarastal meadhanach a chaidh a thabhann: $121,780.

Iarrtasan (LCAs)4
Dearbhaichte4
Seòladh an neach-fhastaidhLos Angeles, CA
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$121,780
Leath mheadhanach nan tuarastalan$115,170–$125,168
Ceudail 10mh–90mh$109,068–$125,472

A bheil Morgner Technology Management a’ toirt taic do bhìosaichean H-1B?

Chuir Morgner Technology Management 4 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 1 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Construction Cost Estimator/Project Manager4$121,780

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$118,560
FY20241$105,000
FY20262$125,337

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Construction Cost Estimator/Project Manager$125,674
Ìre III
Seattle, WA1 Cèit 202616 Sult 2026Dearbhaichte
Construction Cost Estimator/Project Manager$125,000
Ìre IV
Los Angeles, CA2 Màrt 20262 Màrt 2026Dearbhaichte
Construction Cost Estimator/Project Manager$105,000
Ìre IV
Los Angeles, CA12 Màrt 20242 Sult 2024Dearbhaichte
Construction Cost Estimator/Project Manager$118,560
Ìre III
Seattle, WA26 Cèit 202316 Sult 2023Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).