Dachaigh › Luchd-obrach › Motiv Power Systems Inc.
Motiv Power Systems Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Motiv Power Systems Inc. 14 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 13. Tuarastal meadhanach a chaidh a thabhann: $142,000.
A bheil Motiv Power Systems Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Motiv Power Systems Inc. 14 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 1 Dùbh 2025. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Motiv Power Systems Inc.: 4 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Mechanical Engineer IV | 3 | $125,362 |
| Mechanical Engineer III | 3 | $160,077 |
| Mechanical Engineer III Thermal Systems | 2 | $112,570 |
| Sr. Technical Program Manager | 1 | $150,800 |
| Mechanical Engineer | 1 | $144,310 |
| Electrical Engineer | 1 | $118,000 |
| Embedded Software Engineer | 1 | $130,000 |
| Wire Harness Engineer II | 1 | $72,467 |
| Embedded Software Engineer III | 1 | $161,637 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $118,000 |
| FY2024 | 4 | $140,400 |
| FY2025 | 3 | $125,362 |
| FY2026 | 3 | $148,096 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Mechanical Engineers10
- Industrial Engineers1
- Electrical Engineers1
- Software Developers, Systems Software1
- Software Developers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Mechanical Engineer III | $175,157–$225,157 Ìre IV | Foster City, CA | 1 Dùbh 2025 | 26 Dùbh 2025 | Dearbhaichte |
| Embedded Software Engineer III | $161,637–$211,637 Ìre II | Foster City, CA | 16 Sult 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Mechanical Engineer IV | $125,362–$193,503 Ìre IV | Novi, MI | 16 Sult 2025 | 2 Faoi 2026 | Dearbhaichte |
| Wire Harness Engineer II | $72,467–$115,636 Ìre I | Novi, MI | 15 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Mechanical Engineer IV | $117,853–$153,503 Ìre IV | Novi, MI | 8 Lùna 2024 | 19 Lùna 2024 | Dearbhaichte |
| Mechanical Engineer III | $160,077–$170,077 Ìre IV | Foster City, CA | 25 Ògmh 2024 | 13 Samh 2024 | Dearbhaichte |
| Mechanical Engineer III Thermal Systems | $112,570–$130,000 Ìre IV | Novi, MI | 12 Iuch 2023 | 1 Lùna 2023 | Dearbhaichte |
| Mechanical Engineer III Thermal Systems | $112,570–$130,000 Ìre IV | Novi, MI | 12 Iuch 2023 | 1 Lùna 2023 | Air a tharraing air ais |
| Sr. Technical Program Manager | $150,800 Ìre IV | Foster City, CA | 9 Gearr 2023 | 21 Màrt 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Mechanical Engineer III | $142,000 Ìre III | Foster City, CA | 9 Gearr 2023 | 20 Gearr 2023 | Dearbhaichte |
| Mechanical Engineer | $144,310 Ìre III | Foster City, CA | 17 Faoi 2023 | 8 Gearr 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Mechanical Engineer IV | $148,096 Ìre IV | Foster City, CA | 20 Dàmh 2022 | 25 Màrt 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Embedded Software Engineer | $130,000 Ìre II | Foster City, CA | 2 Sult 2021 | 27 Sult 2021 | Dearbhaichte, an uair sin air a tharraing air ais |
| Electrical Engineer | $118,000 Ìre I | Foster City, CA | 24 Samh 2020 | 15 Dùbh 2020 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).