Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › MSR Technology Group LLC › Validation Engineer

Validation Engineer aig MSR Technology Group LLC: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Validation Engineer aig MSR Technology Group LLC. Tuarastal bunasach meadhanach $90,000; leth meadhanach $85,500–$99,000.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$90,000
Leath mheadhanach nan tuarastalan$85,500–$99,000
Ceudail 10mh–90mh$82,500–$108,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20242$82,500
FY20251$93,000
FY20263$101,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$115,000
Ìre IV
Greenville, NC10 Gibl 202620 Gibl 2026Dearbhaichte
$101,000
Ìre III
Greenville, NC10 Gibl 202620 Gibl 2026Dearbhaichte
$87,000
Ìre II
Greenville, NC10 Gibl 202620 Gibl 2026Dearbhaichte
$93,000
Ìre II
Rensselaer, NY9 Dàmh 202421 Dàmh 2024Dearbhaichte
$85,000
Ìre II
Rocky Mount, NC22 Lùna 202426 Lùna 2024Dearbhaichte
$80,000
Ìre II
Rocky Mount, NC22 Faoi 20245 Gearr 2024Dearbhaichte

Validation Engineer aig gach neach-fastaidh →

Obraichean eile aig MSR Technology Group LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).