Dachaigh › Luchd-obrach › Mubea Tailor Rolled Blanks, LLC
Mubea Tailor Rolled Blanks, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Mubea Tailor Rolled Blanks, LLC 12 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 12. Tuarastal meadhanach a chaidh a thabhann: $84,075.
A bheil Mubea Tailor Rolled Blanks, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Mubea Tailor Rolled Blanks, LLC 12 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 8 Dùbh 2025. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Mubea Tailor Rolled Blanks, LLC: 4 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 4 | $80,631 |
| Process Engineer | 3 | $80,000 |
| CAE Engineer | 2 | $70,158 |
| Composites Development Engineer | 1 | $91,000 |
| Maintenance Supervisor | 1 | $89,627 |
| Maintenance Manager | 1 | $88,150 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $85,500 |
| FY2024 | 6 | $70,158 |
| FY2025 | 3 | $88,150 |
| FY2026 | 1 | $93,683 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Process Engineer | $93,683 Ìre II | Florence, KY | 8 Dùbh 2025 | 24 Gibl 2026 | Dearbhaichte |
| Maintenance Supervisor | $89,627 Ìre II | Florence, KY | 19 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Maintenance Manager | $88,150 Ìre I | Florence, KY | 8 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Process Engineer | $75,483 Ìre I | Florence, KY | 9 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer | $70,158–$83,000 Ìre I | Auburn Hills, MI | 10 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| CAE Engineer | $70,158–$86,800 Ìre I | Auburn Hills, MI | 10 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| CAE Engineer | $70,158–$86,800 Ìre I | Auburn Hills, MI | 2 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $70,158–$83,000 Ìre I | Auburn Hills, MI | 2 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $91,104 Ìre II | Auburn Hills, MI | 31 Iuch 2023 | 15 Lùna 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Project Engineer | $91,104 Ìre II | Auburn Hills, MI | 28 Iuch 2023 | 15 Lùna 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Process Engineer | $80,000 Ìre II | Florence, KY | 14 Gibl 2023 | 24 Gibl 2023 | Dearbhaichte |
| Composites Development Engineer | $91,000 Ìre I | Auburn Hills, MI | 8 Samh 2022 | 8 Samh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).