Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › MultiPlan, Inc. › Technical Product Delivery Manager

Technical Product Delivery Manager aig MultiPlan, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Technical Product Delivery Manager aig MultiPlan, Inc.. Tuarastal bunasach meadhanach $145,469; leth meadhanach $128,818–$158,231.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$145,469
Leath mheadhanach nan tuarastalan$128,818–$158,231
Ceudail 10mh–90mh$127,308–$160,762

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$133,348
FY20255$157,590

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$127,308
Ìre II
Forney, TX10 Ògmh 202516 Ògmh 2025Dearbhaichte
$157,590
Ìre III
Aurora, IL6 Ògmh 202526 Sult 2025Dearbhaichte
$127,308
Ìre II
McLean, VA19 Cèit 20251 Dàmh 2025Dearbhaichte
$158,445
Ìre IV
East Windsor, NJ13 Cèit 20257 Dàmh 2025Dearbhaichte
$163,080
Ìre IV
Liberty Hill, TX18 Gibl 202519 Sult 2025Dearbhaichte
$133,348
Ìre III
Naperville, IL23 Màrt 20236 Sult 2023Dearbhaichte

Obraichean eile aig MultiPlan, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).