Dachaigh › Luchd-obrach › MWH Constructors, Inc.
MWH Constructors, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir MWH Constructors, Inc. 21 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 19. Tuarastal meadhanach a chaidh a thabhann: $112,219.
A bheil MWH Constructors, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir MWH Constructors, Inc. 21 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 13 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 5 | $109,438 |
| Estimator | 4 | $84,245 |
| Assistant Project Manager | 2 | $117,300 |
| Digital Delivery Director | 2 | $197,200 |
| Project Manager - Heavy Civil | 2 | $171,213 |
| Project Scheduler | 1 | — |
| Senior Project Scheduler | 1 | $185,000 |
| Scheduler | 1 | — |
| Field Engineer | 1 | $77,272 |
| Program Manager | 1 | — |
| Project Engineer - Civil | 1 | $100,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $142,500 |
| FY2024 | 4 | $171,213 |
| FY2025 | 10 | $114,519 |
| FY2026 | 4 | $86,008 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Austin, TX5
- Phoenix, AZ4
- San Francisco, CA3
- Gresham, OR3
- Broomfield, CO2
- Dallas, TX1
- Wylie, TX1
- Vancouver, WA1
- Del Valle, TX1
Dreuchdan
- Construction Managers9
- Civil Engineers6
- Cost Estimators4
- Mechanical Engineers1
- Architects, Except Landscape and Naval1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Engineer - Civil | $100,000 Ìre II | Gresham, OR | 13 Gibl 2026 | 11 Cèit 2026 | Dearbhaichte |
| Project Engineer | $86,008–$120,000 Ìre II | Austin, TX | 10 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Estimator | $80,000–$95,000 Ìre II | Phoenix, AZ | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Program Manager | $520,000 E-3 · pàirt-àm · Ìre IV | Broomfield, CO | 3 Dùbh 2025 | 15 Faoi 2026 | Dearbhaichte |
| Project Engineer | $109,438 Ìre I | Gresham, OR | 15 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Digital Delivery Director | $224,400 Ìre IV | Vancouver, WA | 15 Gibl 2025 | 30 Sult 2025 | Dearbhaichte |
| Project Engineer | $84,975 Ìre II | Del Valle, TX | 15 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Estimator | $85,490 Ìre II | Phoenix, AZ | 14 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Estimator | $85,490 Ìre II | Phoenix, AZ | 11 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Field Engineer | $77,272 Ìre I | Gresham, OR | 11 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Project Manager - Heavy Civil | $171,213 Ìre IV | Austin, TX | 7 Gibl 2025 | 9 Gibl 2025 | Dearbhaichte |
| Project Engineer | $140,000 Ìre II | Austin, TX | 18 Màrt 2025 | 31 Màrt 2025 | Dearbhaichte |
| Project Engineer | $140,000 Ìre II | Austin, TX | 10 Màrt 2025 | 7 Gibl 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Assistant Project Manager | $119,600 Ìre III | Austin, TX | 17 Dùbh 2024 | 13 Faoi 2025 | Dearbhaichte |
| Senior Project Scheduler | $185,000 Ìre IV | San Francisco, CA | 16 Lùna 2024 | 15 Sult 2024 | Dearbhaichte |
| Scheduler | $185,000 Ìre IV | San Francisco, CA | 15 Lùna 2024 | 15 Sult 2024 | Air a tharraing air ais |
| Project Manager - Heavy Civil | $171,213 Ìre IV | Wylie, TX | 19 Gibl 2024 | 14 Dàmh 2024 | Dearbhaichte |
| Estimator | $83,000 Ìre II | Phoenix, AZ | 15 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Scheduler | $172,000 Ìre IV | San Francisco, CA | 2 Lùna 2023 | 16 Lùna 2023 | Air a tharraing air ais |
| Digital Delivery Director | $170,000 Ìre IV | Broomfield, CO | 7 Ògmh 2023 | 14 Ògmh 2023 | Dearbhaichte |
| Assistant Project Manager | $115,000 Ìre III | Dallas, TX | 10 Faoi 2023 | 31 Faoi 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).