Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › National Railroad Passenger Corporation › Lead Technologist

Lead Technologist aig National Railroad Passenger Corporation: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Lead Technologist aig National Railroad Passenger Corporation. Tuarastal bunasach meadhanach $114,130; leth meadhanach $110,677–$118,409.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$114,130
Leath mheadhanach nan tuarastalan$110,677–$118,409
Ceudail 10mh–90mh$108,338–$121,314

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$110,677
FY20242$121,314

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$123,943–$140,000Indian Trail, NC8 Lùna 202419 Lùna 2024Dearbhaichte
$118,685–$137,000
Ìre IV
Allen, TX26 Iuch 202415 Dùbh 2024Dearbhaichte
$110,677–$137,000Washington, DC27 Iuch 20231 Lùna 2023Dearbhaichte
$110,677–$137,000Washington, DC7 Iuch 202310 Iuch 2023Dearbhaichte
$106,000–$137,000Washington, DC30 Ògmh 20237 Iuch 2023Dearbhaichte
$117,582–$135,000
Ìre IV
Roswell, GA14 Ògmh 202327 Ògmh 2023Dearbhaichte

Obraichean eile aig National Railroad Passenger Corporation

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).