Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Ness USA, Inc. › Senior Engineering Lead

Senior Engineering Lead aig Ness USA, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Senior Engineering Lead aig Ness USA, Inc.. Tuarastal bunasach meadhanach $165,000; leth meadhanach $125,625–$172,500.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$165,000
Leath mheadhanach nan tuarastalan$125,625–$172,500
Ceudail 10mh–90mh$110,500–$175,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$108,500
FY20255$165,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$112,500
Ìre III
Canonsburg, PA5 Ògmh 20251 Dàmh 2025Dearbhaichte
$175,000
Ìre III
Lawrenceville, NJ23 Gibl 20259 Ògmh 2025Dearbhaichte
$165,000
Ìre III
Lawrenceville, NJ15 Gibl 202515 Cèit 2025Dearbhaichte
$165,000
Ìre III
Plano, TX24 Faoi 20253 Màrt 2025Dearbhaichte
$175,000
Ìre III
Frisco, TX24 Faoi 20253 Màrt 2025Dearbhaichte
$108,500
Ìre III
Canonsburg, PA5 Ògmh 20241 Dàmh 2024Dearbhaichte

Obraichean eile aig Ness USA, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).