Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Netflix, Inc. › Engineering Support Solutions Engineer

Engineering Support Solutions Engineer aig Netflix, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Engineering Support Solutions Engineer aig Netflix, Inc.. Tuarastal bunasach meadhanach $226,158; leth meadhanach $130,541–$226,158.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$226,158
Leath mheadhanach nan tuarastalan$130,541–$226,158
Ceudail 10mh–90mh$130,541–$249,172

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20254$178,350
FY20261$264,514

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$264,514
Ìre IV
Los Gatos, CA5 Gearr 202612 Gearr 2026Dearbhaichte
$130,541
Ìre IV
Los Gatos, CA5 Cèit 202519 Cèit 2025Dearbhaichte
$226,158
Ìre IV
Miami, FL5 Màrt 20254 Sult 2025Dearbhaichte
$130,541
Ìre IV
Chicago, IL24 Gearr 20253 Màrt 2025Dearbhaichte
$226,158
Ìre IV
Los Gatos, CA7 Faoi 202520 Faoi 2025Dearbhaichte

Obraichean eile aig Netflix, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).