Dachaigh › Luchd-obrach › Nevada Gold Mines LLC › Engineering Superintendent
Engineering Superintendent aig Nevada Gold Mines LLC: Tuarastalan H-1B
5 iarrtasan cumhaichean-obrach airson an dreuchd Engineering Superintendent aig Nevada Gold Mines LLC. Tuarastal bunasach meadhanach $124,100; leth meadhanach $117,250–$131,400.
Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$124,100
Leath mheadhanach nan tuarastalan$117,250–$131,400
Ceudail 10mh–90mh$115,540–$133,920
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $114,400 |
| FY2024 | 1 | $118,200 |
| FY2025 | 2 | $132,800 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $120,000–$147,300 E-3 · Ìre IV | Carlin, NV | 18 Samh 2025 | 5 Gearr 2026 | Air a tharraing air ais |
| $130,000–$188,400 H-1B1 (Sile) · Ìre IV | Battle Mountain, NV | 23 Sult 2025 | 10 Gearr 2026 | Dearbhaichte |
| $135,600–$172,700 H-1B1 (Sile) · Ìre IV | Battle Mountain, NV | 22 Dàmh 2024 | 10 Gearr 2025 | Dearbhaichte |
| $118,200–$177,400 H-1B1 (Sile) · Ìre IV | Battle Mountain, NV | 29 Sult 2023 | 10 Gearr 2024 | Dearbhaichte |
| $114,400–$171,600 H-1B1 (Sile) · Ìre IV | Battle Mountain, NV | 3 Dàmh 2022 | 10 Gearr 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).