Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › New York Independent System Operator › Planning Engineer, Interconnection Studies

Planning Engineer, Interconnection Studies aig New York Independent System Operator: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Planning Engineer, Interconnection Studies aig New York Independent System Operator. Tuarastal bunasach meadhanach $110,000; leth meadhanach $107,006–$113,392.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$110,000
Leath mheadhanach nan tuarastalan$107,006–$113,392
Ceudail 10mh–90mh$104,743–$115,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$109,006
FY20242$113,392
FY20251$106,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$106,000
Ìre I
Rensselaer, NY2 Gibl 20259 Gibl 2025Dearbhaichte
$111,785
Ìre II
Rensselaer, NY18 Gibl 202418 Dàmh 2024Dearbhaichte
$115,000
Ìre II
Rensselaer, NY21 Samh 202327 Samh 2023Dearbhaichte
$108,011
Ìre I
Rensselaer, NY10 Lùna 202310 Lùna 2023Dearbhaichte
$115,000
Ìre II
Rensselaer, NY6 Ògmh 202310 Iuch 2023Dearbhaichte
$110,000
Ìre I
Rensselaer, NY10 Cèit 202316 Ògmh 2023Dearbhaichte
$102,857
Ìre II
Rensselaer, NY2 Màrt 20231 Cèit 2023Dearbhaichte

Obraichean eile aig New York Independent System Operator

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).