Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › NextEra Energy Resources, LLC › Senior Project Manager Development

Senior Project Manager Development aig NextEra Energy Resources, LLC: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Senior Project Manager Development aig NextEra Energy Resources, LLC. Tuarastal bunasach meadhanach $144,000; leth meadhanach $139,288–$149,656.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$144,000
Leath mheadhanach nan tuarastalan$139,288–$149,656
Ceudail 10mh–90mh$135,645–$155,855

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$139,050
FY20241$148,625
FY20253$145,000
FY20263$153,717

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$175,100
Ìre IV
Juno Beach, FL8 Gibl 20261 Dàmh 2026Dearbhaichte
$153,717
Ìre IV
Juno Beach, FL30 Màrt 20266 Gibl 2026Dearbhaichte
$143,000–$153,000
Ìre II
Juno Beach, FL7 Faoi 202611 Gibl 2026Dearbhaichte
$140,000–$160,000
Ìre IV
Juno Beach, FL27 Cèit 20251 Dàmh 2025Dearbhaichte
$145,000–$165,000
Ìre IV
Juno Beach, FL21 Cèit 20251 Dàmh 2025Dearbhaichte
$150,000–$170,000
Ìre IV
Juno Beach, FL21 Cèit 20251 Dàmh 2025Dearbhaichte
$148,625
Ìre II
Juno Beach, FL20 Màrt 202425 Màrt 2024Dearbhaichte
$139,050
Ìre II
Juno Beach, FL29 Dùbh 202219 Màrt 2023Dearbhaichte
$139,050
Ìre II
Juno Beach, FL26 Sult 202223 Màrt 2023Dearbhaichte, an uair sin air a tharraing air ais
$105,000
Ìre I
Juno Beach, FL8 Gibl 202126 Gibl 2021Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig NextEra Energy Resources, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).