Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › NIKE, Inc. › Manager, Data Engineering

Manager, Data Engineering aig NIKE, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Manager, Data Engineering aig NIKE, Inc.. Tuarastal bunasach meadhanach $179,212; leth meadhanach $178,080–$191,555.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$179,212
Leath mheadhanach nan tuarastalan$178,080–$191,555
Ceudail 10mh–90mh$155,873–$195,003

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$159,574
FY20241$191,555
FY20252$188,257

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$179,212
Ìre III
Lake Oswego, OR21 Gearr 202527 Iuch 2025Dearbhaichte
$197,302
Ìre IV
Beaverton, OR29 Faoi 202512 Gearr 2025Dearbhaichte
$191,555
Ìre IV
Wylie, TX18 Faoi 20241 Gearr 2024Dearbhaichte
$178,080
Ìre III
Hillsboro, OR16 Lùna 20232 Gearr 2024Dearbhaichte
$141,068
Ìre III
Hillsboro, OR9 Lùna 202327 Faoi 2024Dearbhaichte

Manager, Data Engineering aig gach neach-fastaidh →

Obraichean eile aig NIKE, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).