Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Nordstrom, Inc. › Industrial Engr Sr

Industrial Engr Sr aig Nordstrom, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Industrial Engr Sr aig Nordstrom, Inc.. Tuarastal bunasach meadhanach $127,000; leth meadhanach $115,360–$127,822.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$127,000
Leath mheadhanach nan tuarastalan$115,360–$127,822
Ceudail 10mh–90mh$113,305–$138,129

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20242$127,411
FY20253$115,360

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$145,000
Ìre IV
Seattle, WA23 Sult 202514 Dàmh 2025Dearbhaichte
$115,360
Ìre IV
Cedar Rapids, IA2 Iuch 20251 Dàmh 2025Dearbhaichte
$111,935
Ìre IV
Cedar Rapids, IA24 Faoi 202512 Iuch 2025Dearbhaichte
$127,822
Ìre IV
Riverside, CA22 Faoi 20246 Iuch 2024Dearbhaichte
$127,000Los Angeles, CA9 Dàmh 202321 Gearr 2024Dearbhaichte

Obraichean eile aig Nordstrom, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).