Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Northwestern Mutual Life Insurance Company › Engineering Test Lead

Engineering Test Lead aig Northwestern Mutual Life Insurance Company: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Engineering Test Lead aig Northwestern Mutual Life Insurance Company. Tuarastal bunasach meadhanach $136,795; leth meadhanach $129,000–$143,192.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$136,795
Leath mheadhanach nan tuarastalan$129,000–$143,192
Ceudail 10mh–90mh$123,600–$146,077

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20251$132,000
FY20263$141,590

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$120,000
Ìre IV
Milwaukee, WI8 Ògmh 202625 Sult 2026Dearbhaichte
$148,000
Ìre III
Dunellen, NJ10 Dùbh 202529 Cèit 2026Dearbhaichte
$141,590
Ìre IV
Katy, TX2 Dùbh 20256 Màrt 2026Dearbhaichte
$141,590
Ìre IV
Katy, TX26 Samh 20256 Màrt 2026Air a tharraing air ais
$132,000
Ìre IV
Milwaukee, WI24 Gibl 20259 Ògmh 2025Dearbhaichte

Obraichean eile aig Northwestern Mutual Life Insurance Company

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).