Dachaigh › Luchd-obrach › Nova Engineering and Environmental LLC
Nova Engineering and Environmental LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Nova Engineering and Environmental LLC 9 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 9. Tuarastal meadhanach a chaidh a thabhann: $68,827.
A bheil Nova Engineering and Environmental LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Nova Engineering and Environmental LLC 9 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 8 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 2 | $73,226 |
| Staff Engineer | 2 | $63,255 |
| Field Engineer | 2 | $67,112 |
| Project Manager | 1 | $96,200 |
| Structural Project Manager | 1 | $101,200 |
| Senior Engineer | 1 | $145,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $65,034 |
| FY2024 | 2 | $86,912 |
| FY2025 | 4 | $83,526 |
| FY2026 | 1 | $68,370 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Field Engineer | $68,370 Ìre I | Norcross, GA | 8 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Senior Engineer | $145,000 Ìre IV | Kennesaw, GA | 22 Sult 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Field Engineer | $65,853–$76,067 Ìre I | Kennesaw, GA | 18 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Staff Engineer | $65,270 Ìre I | Tampa, FL | 20 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Structural Project Manager | $101,200 Ìre III | Buford, GA | 25 Gearr 2025 | 3 Màrt 2025 | Dearbhaichte |
| Project Engineer | $77,625 Ìre II | Kennesaw, GA | 17 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Manager | $96,200 Ìre II | Buford, GA | 11 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Staff Engineer | $61,240 Ìre I | Tallahassee, FL | 9 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Project Engineer | $68,827 Ìre II | Kennesaw, GA | 23 Gearr 2023 | 1 Màrt 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).