Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Nucor Towers & Structures Inc

Nucor Towers & Structures Inc: Tuarastalan H-1B agus taic bhìosa

Chuir Nucor Towers & Structures Inc 7 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 5. Tuarastal meadhanach a chaidh a thabhann: $95,829.

Iarrtasan (LCAs)7
Dearbhaichte5
Seòladh an neach-fhastaidhRock Hill, SC
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$95,829
Leath mheadhanach nan tuarastalan$93,558–$111,624
Ceudail 10mh–90mh$88,423–$116,650

A bheil Nucor Towers & Structures Inc a’ toirt taic do bhìosaichean H-1B?

Chuir Nucor Towers & Structures Inc 7 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 12 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Transmissions Structural Engineer3$103,726
Senior Structural Engineer2$120,000
Structural Engineer1$85,000
EHS Coordinator1$93,558

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$90,414
FY20264$111,624

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
EHS Coordinator$93,558
Ìre II
New Ross, IN12 Cèit 202619 Cèit 2026Dearbhaichte
Senior Structural Engineer$120,000–$140,000
Ìre IV
Rock Hill, SC26 Gibl 20261 Dàmh 2026Air a tharraing air ais
Senior Structural Engineer$120,000–$140,000
Ìre IV
Rock Hill, SC22 Gibl 20261 Dàmh 2026Dearbhaichte
Transmissions Structural Engineer$111,624
Ìre II
Rock Hill, SC31 Màrt 202614 Lùna 2026Dearbhaichte
Transmissions Structural Engineer$95,829
Ìre II
Rock Hill, SC18 Iuch 202314 Lùna 2023Dearbhaichte
Transmissions Structural Engineer$95,829
Ìre II
Rock Hill, SC18 Iuch 202314 Lùna 2023Air a tharraing air ais
Structural Engineer$85,000
Ìre I
West Hazleton, PA7 Màrt 202311 Cèit 2023Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).