Dachaigh › Luchd-obrach › Nyrstar Tennessee Mines - Strawberry Plains, LLC
Nyrstar Tennessee Mines - Strawberry Plains, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Nyrstar Tennessee Mines - Strawberry Plains, LLC 9 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 8. Tuarastal meadhanach a chaidh a thabhann: $133,494.
A bheil Nyrstar Tennessee Mines - Strawberry Plains, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Nyrstar Tennessee Mines - Strawberry Plains, LLC 9 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 23 Màrt 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Principal Mining Engineer - North America | 2 | $123,282 |
| General Manager - Operations and Engineering | 2 | $133,494 |
| Vice President for Asset Management, North American Mining | 1 | $113,069 |
| Short Term Planner | 1 | $72,405 |
| MTS Mine Engineering Manager | 1 | $133,494 |
| Mine Manager – Immel Mine | 1 | $133,494 |
| Mine Manager | 1 | $133,494 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $113,069 |
| FY2025 | 3 | $133,494 |
| FY2026 | 4 | $133,494 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| General Manager - Operations and Engineering | $133,494–$270,000 E-3 · Ìre IV | Strawberry Plains, TN | 23 Màrt 2026 | 1 Gibl 2026 | Dearbhaichte |
| General Manager - Operations and Engineering | $133,494–$220,000 E-3 · Ìre IV | Strawberry Plains, TN | 23 Màrt 2026 | 1 Gibl 2026 | Air a tharraing air ais |
| Mine Manager | $133,494–$180,000 E-3 · Ìre IV | Strawberry Plains, TN | 23 Gearr 2026 | 2 Màrt 2026 | Dearbhaichte |
| Mine Manager – Immel Mine | $133,494–$220,000 E-3 · Ìre IV | Strawberry Plains, TN | 7 Samh 2025 | 1 Dùbh 2025 | Dearbhaichte |
| Short Term Planner | $72,405–$100,000 E-3 · Ìre II | Strawberry Plains, TN | 11 Sult 2025 | 29 Sult 2025 | Dearbhaichte |
| MTS Mine Engineering Manager | $133,494–$150,000 E-3 · Ìre IV | Strawberry Plains, TN | 29 Lùna 2025 | 15 Sult 2025 | Dearbhaichte |
| Principal Mining Engineer - North America | $133,494–$172,677 E-3 · Ìre IV | Strawberry Plains, TN | 29 Iuch 2025 | 5 Sult 2025 | Dearbhaichte |
| Vice President for Asset Management, North American Mining | $113,069–$250,000 E-3 · Ìre IV | Gordonsville, TN | 25 Lùna 2023 | 11 Sult 2023 | Dearbhaichte |
| Principal Mining Engineer - North America | $113,069–$150,000 E-3 · Ìre IV | Strawberry Plains, TN | 17 Lùna 2023 | 5 Sult 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).