Dachaigh › Luchd-obrach › OCMI, Inc.
OCMI, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir OCMI, Inc. 21 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 17. Tuarastal meadhanach a chaidh a thabhann: $125,000.
A bheil OCMI, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir OCMI, Inc. 21 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 27 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Senior Cost Estimator | 5 | $120,000 |
| Sr. Cost Estimator | 3 | $140,000 |
| Construction Cost Estimator | 2 | $118,686 |
| Cost Manager | 2 | $141,500 |
| Cost Estimator | 1 | $92,500 |
| Cost Estimator II | 1 | $73,000 |
| Cost Estimator I | 1 | $100,000 |
| Project Controls Engineer I | 1 | $75,000 |
| Scheduler I | 1 | — |
| Scheduler | 1 | $121,000 |
| Senior Project Controls Engineer | 1 | $165,000 |
| Regional Cost Manager | 1 | $180,000 |
| Senior Cost Estimator II | 1 | — |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $82,750 |
| FY2024 | 9 | $120,000 |
| FY2025 | 6 | $138,375 |
| FY2026 | 4 | $124,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Henderson, NV6
- Seattle, WA4
- Charlotte, NC3
- Richardson, TX2
- Irvine, CA1
- Torrance, CA1
- Columbus, OH1
- Rockville, MD1
- Fremont, CA1
- North Bethesda, MD1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Cost Manager | $153,000 Ìre IV | Seattle, WA | 27 Cèit 2026 | 6 Samh 2026 | Dearbhaichte |
| Senior Cost Estimator | $95,000 Ìre III | Henderson, NV | 6 Gibl 2026 | 4 Sult 2026 | Dearbhaichte |
| Senior Cost Estimator II | $95,000 Ìre III | Henderson, NV | 31 Màrt 2026 | 4 Sult 2026 | Air a tharraing air ais |
| Senior Cost Estimator | $95,000 Ìre III | Henderson, NV | 27 Màrt 2026 | 4 Sult 2026 | Air a tharraing air ais |
| Cost Manager | $130,000 Ìre IV | Charlotte, NC | 3 Iuch 2025 | 1 Faoi 2026 | Dearbhaichte |
| Sr. Cost Estimator | $143,500 Ìre IV | Richardson, TX | 13 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Regional Cost Manager | $180,000 Ìre IV | North Bethesda, MD | 11 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Senior Cost Estimator | $133,250 Ìre III | Fremont, CA | 27 Màrt 2025 | 22 Ògmh 2025 | Dearbhaichte |
| Construction Cost Estimator | $150,012 Ìre IV | Rockville, MD | 26 Iuch 2024 | 13 Faoi 2025 | Dearbhaichte |
| Project Controls Engineer I | $75,000 Ìre I | Charlotte, NC | 22 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Scheduler I | $85,000 Ìre I | Torrance, CA | 16 Gibl 2024 | 1 Dàmh 2024 | Air a tharraing air ais |
| Scheduler | $121,000 Ìre III | Columbus, OH | 8 Gibl 2024 | 17 Gibl 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Senior Project Controls Engineer | $165,000 Ìre IV | Henderson, NV | 5 Gibl 2024 | 22 Gibl 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Senior Cost Estimator | $120,000 Ìre III | Seattle, WA | 15 Faoi 2024 | 5 Gearr 2024 | Dearbhaichte |
| Senior Cost Estimator | $120,000 Ìre IV | Seattle, WA | 15 Faoi 2024 | 5 Gearr 2024 | Air a tharraing air ais |
| Cost Estimator I | $100,000 Ìre IV | Henderson, NV | 5 Dùbh 2023 | 2 Faoi 2024 | Dearbhaichte |
| Sr. Cost Estimator | $140,000 Ìre IV | Richardson, TX | 30 Dàmh 2023 | 27 Samh 2023 | Dearbhaichte |
| Sr. Cost Estimator | $125,000 Ìre IV | Seattle, WA | 6 Dàmh 2023 | 6 Samh 2023 | Dearbhaichte |
| Cost Estimator II | $73,000 Ìre II | Henderson, NV | 21 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Cost Estimator | $92,500 Ìre IV | Charlotte, NC | 23 Samh 2022 | 1 Faoi 2023 | Dearbhaichte |
| Construction Cost Estimator | $87,360 Ìre II | Irvine, CA | 16 Sult 2022 | 3 Dàmh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).