Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Oma4 LLC › Full Stack Developer

Full Stack Developer aig Oma4 LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Full Stack Developer aig Oma4 LLC. Tuarastal bunasach meadhanach $99,195; leth meadhanach $99,100–$103,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$99,195
Leath mheadhanach nan tuarastalan$99,100–$103,000
Ceudail 10mh–90mh$99,100–$103,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$99,100
FY20242$103,000
FY20261$99,195

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$99,195
Ìre II
Lake Mary, FL17 Faoi 202619 Faoi 2026Dearbhaichte
$103,000
Ìre II
Cumming, GA13 Ògmh 20241 Dàmh 2024Dearbhaichte
$103,000
Ìre II
Cumming, GA27 Cèit 20241 Dàmh 2024Dearbhaichte
$99,100
Ìre II
Cumming, GA20 Cèit 20231 Dàmh 2023Dearbhaichte
$99,100
Ìre II
Cumming, GA20 Cèit 20231 Dàmh 2023Dearbhaichte

Full Stack Developer aig gach neach-fastaidh →

Obraichean eile aig Oma4 LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).