Dachaigh › Luchd-obrach › OPmobility Holding USA, Inc.
OPmobility Holding USA, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir OPmobility Holding USA, Inc. 12 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 12. Tuarastal meadhanach a chaidh a thabhann: $100,650.
A bheil OPmobility Holding USA, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir OPmobility Holding USA, Inc. 12 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 16 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Plant Quality Engineer | 3 | $103,300 |
| Plant Methods Engineer | 2 | $95,000 |
| Paint Process Engineer | 1 | $105,000 |
| Project Quality Leader | 1 | $122,596 |
| Site Paint Engineer | 1 | $98,000 |
| Engineering Project Manager | 1 | $76,648 |
| Site Excellence Leader | 1 | $127,000 |
| Site Engineer | 1 | $112,043 |
| Site MRO Lead Buyer | 1 | $97,335 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 2 | $113,798 |
| FY2026 | 10 | $97,668 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Industrial Engineers10
- Industrial Production Managers1
- Purchasing Agents, Except Wholesale, Retail, and Farm Products1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Plant Quality Engineer | $103,300 Ìre II | Anderson, SC | 16 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Plant Methods Engineer | $95,000 Ìre I | Greer, SC | 1 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Site MRO Lead Buyer | $97,335 Ìre II | Greer, SC | 11 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Site Engineer | $112,043 Ìre I | Spring Hill, TN | 1 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Plant Quality Engineer | $90,000 Ìre I | Spring Hill, TN | 29 Gibl 2026 | 15 Cèit 2026 | Dearbhaichte |
| Site Excellence Leader | $127,000 Ìre IV | Chattanooga, TN | 27 Gibl 2026 | 15 Cèit 2026 | Dearbhaichte |
| Site Paint Engineer | $98,000 Ìre I | Greer, SC | 23 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Engineering Project Manager | $76,648–$117,492 Ìre I | Troy, MI | 23 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Plant Quality Engineer | $103,300 Ìre I | Anderson, SC | 15 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Plant Methods Engineer | $95,000 Ìre I | Greer, SC | 15 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Quality Leader | $122,596 Ìre II | Chattanooga, TN | 6 Lùna 2025 | 25 Faoi 2026 | Dearbhaichte |
| Paint Process Engineer | $105,000 Ìre III | Anderson, SC | 8 Gibl 2025 | 8 Gibl 2025 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).