Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Optum Services, Inc. › Principal Quality Engineer

Principal Quality Engineer aig Optum Services, Inc.: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Principal Quality Engineer aig Optum Services, Inc.. Tuarastal bunasach meadhanach $127,431; leth meadhanach $123,807–$129,343.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$127,431
Leath mheadhanach nan tuarastalan$123,807–$129,343
Ceudail 10mh–90mh$118,945–$135,628

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$118,480
FY20242$134,646
FY20253$127,431
FY20262$128,387

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$129,343–$228,186
Ìre III
Minnetonka, MN19 Ògmh 202617 Dùbh 2026Dearbhaichte
$127,431–$221,445
Ìre III
Minnetonka, MN14 Faoi 202616 Iuch 2026Dearbhaichte
$127,431–$221,445
Ìre III
Eden Prairie, MN23 Sult 202525 Màrt 2026Dearbhaichte
$134,060–$210,880
Ìre II
Boston, MA30 Ògmh 202522 Dùbh 2025Dearbhaichte
$120,393–$201,800Eden Prairie, MN1 Dàmh 202428 Màrt 2025Dearbhaichte
$127,393–$170,600Austin, TX30 Lùna 20242 Sult 2024Dearbhaichte
$141,898–$201,800
Ìre IV
Eden Prairie, MN23 Lùna 202419 Gearr 2025Dearbhaichte
$113,152–$140,000
Ìre III
Eden Prairie, MN8 Samh 20226 Cèit 2023Dearbhaichte
$123,807–$159,893
Ìre II
Washington, DC12 Dàmh 202226 Gearr 2023Dearbhaichte

Principal Quality Engineer aig gach neach-fastaidh →

Obraichean eile aig Optum Services, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).