Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Oracle America, Inc. › Senior Data Center Construction Manager

Senior Data Center Construction Manager aig Oracle America, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Senior Data Center Construction Manager aig Oracle America, Inc.. Tuarastal bunasach meadhanach $112,528; leth meadhanach $112,528–$131,082.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$112,528
Leath mheadhanach nan tuarastalan$112,528–$131,082
Ceudail 10mh–90mh$110,007–$149,128

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20265$112,528

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$108,326–$228,283
Ìre IV
Santa Teresa, NM26 Cèit 20261 Ògmh 2026Dearbhaichte
$112,528–$180,306
Ìre IV
Abilene, TX1 Gibl 20261 Gibl 2026Dearbhaichte
$161,158–$214,113
Ìre IV
Herndon, VA1 Gibl 20261 Gibl 2026Dearbhaichte
$131,082–$202,844
Ìre IV
Aubrey, TX1 Gibl 20261 Gibl 2026Dearbhaichte
$112,528–$228,283
Ìre IV
Abilene, TX31 Dàmh 20253 Samh 2025Dearbhaichte

Obraichean eile aig Oracle America, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).