Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Overland Contracting, Inc.

Overland Contracting, Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir Overland Contracting, Inc. 5 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 5. Tuarastal meadhanach a chaidh a thabhann: $76,274.

Iarrtasan (LCAs)5
Dearbhaichte5
Seòladh an neach-fhastaidhOverland Park, KS
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$76,274
Leath mheadhanach nan tuarastalan$76,274–$90,480
Ceudail 10mh–90mh$73,353–$90,480

A bheil Overland Contracting, Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir Overland Contracting, Inc. 5 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 17 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Field Engineer 2, Civil2$76,274
Construction Manager 22$90,480
Construction Manager 31$71,406

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$76,274
FY20252$90,480
FY20261$71,406

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Construction Manager 3$71,406–$168,310
Ìre I
Overland Park, KS17 Ògmh 20261 Iuch 2026Dearbhaichte
Construction Manager 2$90,480–$140,140
Ìre II
Tampa, FL7 Lùna 202522 Faoi 2026Dearbhaichte
Construction Manager 2$90,480–$140,140
Ìre II
Tampa, FL24 Iuch 202522 Faoi 2026Dearbhaichte, an uair sin air a tharraing air ais
Field Engineer 2, Civil$76,274–$122,410
Ìre II
Dunedin, FL19 Dàmh 202222 Faoi 2023Dearbhaichte
Field Engineer 2, Civil$76,274–$122,410
Ìre II
Dunedin, FL7 Dàmh 202222 Faoi 2023Dearbhaichte, an uair sin air a tharraing air ais

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).