Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › PamTen, Inc. › Systems Engineer

Systems Engineer aig PamTen, Inc.: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Systems Engineer aig PamTen, Inc.. Tuarastal bunasach meadhanach $92,500; leth meadhanach $81,000–$95,000.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$92,500
Leath mheadhanach nan tuarastalan$81,000–$95,000
Ceudail 10mh–90mh$80,700–$101,300

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$80,000
FY20243$90,000
FY20254$95,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$116,000
Ìre II
Jersey City, NJ18 Lùna 20251 Dàmh 2025Dearbhaichte
$95,000
Ìre II
Irving, TX6 Màrt 202512 Lùna 2025Dearbhaichte
$95,000
Ìre II
Chadds Ford, PA14 Samh 202425 Samh 2024Dearbhaichte
$81,000
Ìre I
Monmouth Junction, NJ5 Samh 20245 Samh 2024Dearbhaichte
$90,000
Ìre II
Raleigh, NC9 Sult 202416 Sult 2024Dearbhaichte
$81,000
Ìre II
Atlanta, GA9 Sult 20249 Sult 2024Dearbhaichte
$95,000
Ìre II
Princeton, NJ27 Lùna 20241 Dàmh 2024Dearbhaichte
$80,000
Ìre II
Auburn Hills, MI14 Lùna 202321 Lùna 2023Dearbhaichte

Systems Engineer aig gach neach-fastaidh →

Obraichean eile aig PamTen, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).