Dachaigh › Luchd-obrach › PCL Construction, Inc.
PCL Construction, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir PCL Construction, Inc. 16 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 16. Tuarastal meadhanach a chaidh a thabhann: $89,285.
A bheil PCL Construction, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir PCL Construction, Inc. 16 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 18 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig PCL Construction, Inc.: 5 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 4 | $90,928 |
| Project Engineer II | 4 | $86,250 |
| Project Manager | 3 | $112,590 |
| Integrated Construction Tech Specialist | 1 | $68,474 |
| Field Engineer - 020072.000157 | 1 | $73,133 |
| Project Engineer - 020072.000114 | 1 | $85,155 |
| Estimator | 1 | $130,500 |
| Integrated Construction Technical Specialist | 1 | $86,195 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $87,194 |
| FY2024 | 5 | $89,170 |
| FY2025 | 4 | $94,381 |
| FY2026 | 4 | $87,798 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Tempe, AZ5
- Salt Lake City, UT3
- Denver, CO2
- Long Beach, CA2
- Walnut Creek, CA1
- Litchfield, AZ1
- Tampa, FL1
- Rialto, CA1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Integrated Construction Technical Specialist | $86,195–$102,066 Ìre I | Tempe, AZ | 18 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Manager | $126,485–$148,970 Ìre III | Denver, CO | 23 Gibl 2026 | 1 Cèit 2026 | Dearbhaichte |
| Project Engineer II | $83,100 Ìre II | Salt Lake City, UT | 10 Màrt 2026 | 1 Gibl 2026 | Dearbhaichte |
| Project Engineer II | $89,400 Ìre I | Long Beach, CA | 24 Samh 2025 | 8 Dùbh 2025 | Dearbhaichte |
| Project Engineer II | $78,000 Ìre I | Salt Lake City, UT | 18 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer II | $89,400 Ìre I | Rialto, CA | 1 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Estimator | $130,500–$159,500 Ìre III | Long Beach, CA | 10 Gearr 2025 | 12 Gearr 2025 | Dearbhaichte |
| Project Manager | $99,362–$120,000 Ìre II | Tempe, AZ | 5 Gearr 2025 | 14 Cèit 2025 | Dearbhaichte |
| Project Engineer | $89,170–$109,096 Ìre II | Salt Lake City, UT | 19 Lùna 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer - 020072.000114 | $85,155–$105,040 Ìre II | Tampa, FL | 8 Lùna 2024 | 15 Dùbh 2024 | Dearbhaichte |
| Field Engineer - 020072.000157 | $73,133–$92,685 Ìre I | Litchfield, AZ | 25 Màrt 2024 | 20 Sult 2024 | Dearbhaichte |
| Project Engineer | $92,685–$112,215 Ìre II | Tempe, AZ | 9 Gearr 2024 | 14 Cèit 2024 | Dearbhaichte |
| Project Engineer | $97,282–$116,314 Ìre II | Denver, CO | 30 Dàmh 2023 | 27 Samh 2023 | Dearbhaichte |
| Integrated Construction Tech Specialist | $68,474–$89,336 Ìre I | Tempe, AZ | 10 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Project Manager | $112,590–$139,630 Ìre II | Walnut Creek, CA | 14 Gearr 2023 | 1 Màrt 2023 | Dearbhaichte |
| Project Engineer | $87,194–$103,375 Ìre II | Tempe, AZ | 18 Faoi 2023 | 1 Gearr 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).