Dachaigh › Luchd-obrach › PegasusTSI, Inc.
PegasusTSI, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir PegasusTSI, Inc. 20 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 19. Tuarastal meadhanach a chaidh a thabhann: $108,285.
A bheil PegasusTSI, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir PegasusTSI, Inc. 20 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 18 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Electrical Engineer | 4 | $121,721 |
| Civil/Structural Engineer | 3 | $70,720 |
| Process Engineer | 3 | $101,442 |
| Project Engineering Manager | 2 | $117,520 |
| Senior Piping Engineer | 2 | $120,152 |
| Engineer | 1 | $103,168 |
| Sr. Electrical Engineer | 1 | $116,480 |
| Civil Engineer | 1 | $102,835 |
| Mechanical Engineer | 1 | $110,240 |
| Engineer, Civil & Structural | 1 | $108,285 |
| Sr. Civil/Structural Engineer | 1 | $114,774 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | — |
| FY2024 | 5 | $102,835 |
| FY2025 | 1 | $103,168 |
| FY2026 | 13 | $114,649 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Civil Engineers7
- Electrical Engineers4
- Civil Engineering Technologists and Technicians3
- Mechanical Engineers2
- Chemical Engineers2
- Architectural and Engineering Managers1
- Electrical and Electronic Engineering Technologists and Technicians1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Electrical Engineer | $125,985 H-1B1 (Sile) · Ìre IV | Tampa, FL | 18 Cèit 2026 | 25 Cèit 2026 | Dearbhaichte |
| Civil/Structural Engineer | $74,936 H-1B1 (Sile) · Ìre III | Tampa, FL | 15 Cèit 2026 | 22 Cèit 2026 | Dearbhaichte |
| Sr. Civil/Structural Engineer | $114,774 Ìre III | Tampa, FL | 15 Cèit 2026 | 22 Cèit 2026 | Dearbhaichte |
| Process Engineer | $106,517 H-1B1 (Sile) · Ìre IV | Tampa, FL | 11 Cèit 2026 | 18 Cèit 2026 | Dearbhaichte |
| Project Engineering Manager | $120,390 H-1B1 (Sile) · Ìre IV | Tampa, FL | 11 Cèit 2026 | 18 Cèit 2026 | Dearbhaichte |
| Senior Piping Engineer | $122,221 Ìre III | Tampa, FL | 27 Gibl 2026 | 28 Gibl 2026 | Dearbhaichte |
| Electrical Engineer | $121,721 H-1B1 (Sile) · Ìre II | Tampa, FL | 15 Sult 2025 | 1 Dùbh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Project Engineering Manager | $114,649 H-1B1 (Sile) · Ìre I | Tampa, FL | 23 Cèit 2025 | 4 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Process Engineer | $101,442 H-1B1 (Sile) · Ìre II | Tampa, FL | 23 Cèit 2025 | 27 Sult 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Civil/Structural Engineer | $70,720 H-1B1 (Sile) · Ìre I | Tampa, FL | 23 Cèit 2025 | 13 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Electrical Engineer | $93,475 Ìre I | Tampa, FL | 23 Cèit 2025 | 1 Samh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Engineer, Civil & Structural | $108,285 Ìre II | Tampa, FL | 6 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Senior Piping Engineer | $118,082 Ìre II | Tampa, FL | 6 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Mechanical Engineer | $110,240 H-1B1 (Sile) · Ìre II | Tampa, FL | 26 Ògmh 2024 | 25 Sult 2024 | Dearbhaichte |
| Process Engineer | $101,442 H-1B1 (Sile) · Ìre II | Tampa, FL | 18 Ògmh 2024 | 25 Sult 2024 | Dearbhaichte |
| Civil Engineer | $102,835 H-1B1 (Sile) · Ìre II | Tampa, FL | 13 Ògmh 2024 | 1 Samh 2024 | Dearbhaichte |
| Civil/Structural Engineer | $70,720 H-1B1 (Sile) · Ìre I | Tampa, FL | 22 Gearr 2024 | 11 Màrt 2024 | Dearbhaichte |
| Sr. Electrical Engineer | $116,480 H-1B1 (Sile) · Ìre II | Tampa, FL | 18 Faoi 2024 | 4 Màrt 2024 | Dearbhaichte |
| Engineer | $103,168 Ìre II | Tampa, FL | 10 Gibl 2023 | 27 Lùna 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Electrical Engineer | $76,398 H-1B1 (Sile) · Ìre I | Tampa, FL | 11 Dàmh 2022 | 1 Samh 2022 | Air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).