Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › PegasusTSI, Inc.

PegasusTSI, Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir PegasusTSI, Inc. 20 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 19. Tuarastal meadhanach a chaidh a thabhann: $108,285.

Iarrtasan (LCAs)20
Dearbhaichte19
Seòladh an neach-fhastaidhTampa, FL
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$108,285
Leath mheadhanach nan tuarastalan$101,442–$117,281
Ceudail 10mh–90mh$74,093–$121,821

A bheil PegasusTSI, Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir PegasusTSI, Inc. 20 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 18 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Electrical Engineer4$121,721
Civil/Structural Engineer3$70,720
Process Engineer3$101,442
Project Engineering Manager2$117,520
Senior Piping Engineer2$120,152
Engineer1$103,168
Sr. Electrical Engineer1$116,480
Civil Engineer1$102,835
Mechanical Engineer1$110,240
Engineer, Civil & Structural1$108,285
Sr. Civil/Structural Engineer1$114,774

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231—
FY20245$102,835
FY20251$103,168
FY202613$114,649

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Electrical Engineer$125,985
H-1B1 (Sile) · Ìre IV
Tampa, FL18 Cèit 202625 Cèit 2026Dearbhaichte
Civil/Structural Engineer$74,936
H-1B1 (Sile) · Ìre III
Tampa, FL15 Cèit 202622 Cèit 2026Dearbhaichte
Sr. Civil/Structural Engineer$114,774
Ìre III
Tampa, FL15 Cèit 202622 Cèit 2026Dearbhaichte
Process Engineer$106,517
H-1B1 (Sile) · Ìre IV
Tampa, FL11 Cèit 202618 Cèit 2026Dearbhaichte
Project Engineering Manager$120,390
H-1B1 (Sile) · Ìre IV
Tampa, FL11 Cèit 202618 Cèit 2026Dearbhaichte
Senior Piping Engineer$122,221
Ìre III
Tampa, FL27 Gibl 202628 Gibl 2026Dearbhaichte
Electrical Engineer$121,721
H-1B1 (Sile) · Ìre II
Tampa, FL15 Sult 20251 Dùbh 2025Dearbhaichte, an uair sin air a tharraing air ais
Project Engineering Manager$114,649
H-1B1 (Sile) · Ìre I
Tampa, FL23 Cèit 20254 Dàmh 2025Dearbhaichte, an uair sin air a tharraing air ais
Process Engineer$101,442
H-1B1 (Sile) · Ìre II
Tampa, FL23 Cèit 202527 Sult 2025Dearbhaichte, an uair sin air a tharraing air ais
Civil/Structural Engineer$70,720
H-1B1 (Sile) · Ìre I
Tampa, FL23 Cèit 202513 Dàmh 2025Dearbhaichte, an uair sin air a tharraing air ais
Electrical Engineer$93,475
Ìre I
Tampa, FL23 Cèit 20251 Samh 2025Dearbhaichte, an uair sin air a tharraing air ais
Engineer, Civil & Structural$108,285
Ìre II
Tampa, FL6 Cèit 20251 Dàmh 2025Dearbhaichte, an uair sin air a tharraing air ais
Senior Piping Engineer$118,082
Ìre II
Tampa, FL6 Cèit 20251 Dàmh 2025Dearbhaichte, an uair sin air a tharraing air ais
Mechanical Engineer$110,240
H-1B1 (Sile) · Ìre II
Tampa, FL26 Ògmh 202425 Sult 2024Dearbhaichte
Process Engineer$101,442
H-1B1 (Sile) · Ìre II
Tampa, FL18 Ògmh 202425 Sult 2024Dearbhaichte
Civil Engineer$102,835
H-1B1 (Sile) · Ìre II
Tampa, FL13 Ògmh 20241 Samh 2024Dearbhaichte
Civil/Structural Engineer$70,720
H-1B1 (Sile) · Ìre I
Tampa, FL22 Gearr 202411 Màrt 2024Dearbhaichte
Sr. Electrical Engineer$116,480
H-1B1 (Sile) · Ìre II
Tampa, FL18 Faoi 20244 Màrt 2024Dearbhaichte
Engineer$103,168
Ìre II
Tampa, FL10 Gibl 202327 Lùna 2023Dearbhaichte, an uair sin air a tharraing air ais
Electrical Engineer$76,398
H-1B1 (Sile) · Ìre I
Tampa, FL11 Dàmh 20221 Samh 2022Air a tharraing air ais

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).