Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › People Infra LLC

People Infra LLC: Tuarastalan H-1B agus taic bhìosa

Chuir People Infra LLC 14 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 7. Tuarastal meadhanach a chaidh a thabhann: $92,123.

Iarrtasan (LCAs)14
Dearbhaichte7
Seòladh an neach-fhastaidhRedmond, WA
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$92,123
Leath mheadhanach nan tuarastalan$89,471–$92,123
Ceudail 10mh–90mh$87,880–$92,123

A bheil People Infra LLC a’ toirt taic do bhìosaichean H-1B?

Chuir People Infra LLC 14 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 1 Gibl 2025. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Civil Engineer14$92,123

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY202310$86,819
FY20254$92,123

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Civil Engineer$92,123–$92,144
pàirt-àm · Ìre II
Issaquah, WA1 Gibl 202512 Gibl 2025Dearbhaichte
Civil Engineer$92,123–$92,144
pàirt-àm · Ìre II
Issaquah, WA25 Màrt 202512 Gibl 2025Dearbhaichte
Civil Engineer$92,123–$92,144
Ìre II
Issaquah, WA3 Faoi 202512 Gibl 2025Dearbhaichte
Civil Engineer$92,123–$92,144
Ìre II
Issaquah, WA3 Faoi 202512 Gibl 2025Dearbhaichte
Civil Engineer$86,819–$86,840
pàirt-àm · Ìre II
Issaquah, WA9 Ògmh 20239 Ògmh 2023Dearbhaichte
Civil Engineer$86,819–$86,840
pàirt-àm · Ìre II
Issaquah, WA25 Cèit 202325 Cèit 2023Dearbhaichte
Civil Engineer$86,819–$86,840
Ìre II
Issaquah, WA25 Cèit 202325 Cèit 2023Dearbhaichte
Civil Engineer$86,819–$86,820
Ìre II
Issaquah, WA25 Cèit 202325 Cèit 2023Air a tharraing air ais
Civil Engineer$86,819–$88,899
pàirt-àm · Ìre II
Issaquah, WA24 Cèit 202324 Cèit 2023Air a tharraing air ais
Civil Engineer$86,819–$86,820
Ìre II
Issaquah, WA24 Cèit 202324 Cèit 2023Air a tharraing air ais
Civil Engineer$86,819–$86,820
Ìre II
Bellevue, WA24 Cèit 202324 Cèit 2023Air a tharraing air ais
Civil Engineer$86,819–$86,820
Ìre II
Issaquah, WA24 Cèit 202324 Cèit 2023Air a tharraing air ais
Civil Engineer$86,819–$86,840
pàirt-àm · Ìre II
Issaquah, WA24 Cèit 202324 Cèit 2023Air a tharraing air ais
Civil Engineer$86,819–$86,840
Ìre II
Issaquah, WA24 Cèit 202324 Cèit 2023Air a tharraing air ais

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).