Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › People Tech Group, Inc › Sr. Technical Project Manager

Sr. Technical Project Manager aig People Tech Group, Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Technical Project Manager aig People Tech Group, Inc. Tuarastal bunasach meadhanach $138,174; leth meadhanach $138,174–$138,174.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$138,174
Leath mheadhanach nan tuarastalan$138,174–$138,174
Ceudail 10mh–90mh$138,174–$138,174

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20252$138,174

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$138,154–$138,155
Ìre III
Issaquah, WA3 Samh 20253 Samh 2025Air a tharraing air ais
$138,154–$138,155
Ìre III
Issaquah, WA3 Samh 20253 Samh 2025Air a tharraing air ais
$138,154–$138,155
Ìre III
Issaquah, WA3 Samh 20253 Samh 2025Air a tharraing air ais
$138,174–$138,195
Ìre III
Issaquah, WA2 Cèit 20252 Cèit 2025Dearbhaichte
$138,174–$138,195
Ìre III
Redmond, WA2 Cèit 20252 Cèit 2025Dearbhaichte

Sr. Technical Project Manager aig gach neach-fastaidh →

Obraichean eile aig People Tech Group, Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).