Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Persistent Systems, Inc. › Senior Engineering Lead II

Senior Engineering Lead II aig Persistent Systems, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Senior Engineering Lead II aig Persistent Systems, Inc.. Tuarastal bunasach meadhanach $109,283; leth meadhanach $106,366–$121,628.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$109,283
Leath mheadhanach nan tuarastalan$106,366–$121,628
Ceudail 10mh–90mh$95,950–$131,306

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$109,283
FY20243$115,918
FY20251$103,450

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$103,450Lone Tree, CO2 Sult 202511 Sult 2025Dearbhaichte
$137,259
Ìre II
Bellevue, WA15 Iuch 20241 Dàmh 2024Dearbhaichte
$84,700Dublin, OH2 Gibl 202410 Gibl 2024Dearbhaichte
$115,918–$133,104
Ìre II
Bridgewater Township, NJ16 Dàmh 202320 Dàmh 2023Dearbhaichte
$109,283–$109,285
Ìre II
Bridgewater Township, NJ18 Cèit 202323 Cèit 2023Dearbhaichte
$109,283–$109,285
Ìre II
Bridgewater Township, NJ24 Gibl 202328 Gibl 2023Dearbhaichte
$127,338–$127,340
Ìre II
Bellevue, WA14 Gibl 202320 Gibl 2023Dearbhaichte

Obraichean eile aig Persistent Systems, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).