Dachaigh › Luchd-obrach › Pinto Valley Mining Corp.
Pinto Valley Mining Corp.: Tuarastalan H-1B agus taic bhìosa
Chuir Pinto Valley Mining Corp. 14 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 14. Tuarastal meadhanach a chaidh a thabhann: $150,000.
A bheil Pinto Valley Mining Corp. a’ toirt taic do bhìosaichean H-1B?
Chuir Pinto Valley Mining Corp. 14 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 26 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Commercial Manager - KBGFJG271199-1 | 1 | $210,000 |
| Mine General Manager - KBGFJG206857-5 | 1 | $243,800 |
| Chief Metallurgist - KBGFJG300307-1 | 1 | $145,000 |
| Geologist - KBGFJG350298-1 | 1 | $103,100 |
| Manager, Training & Culture - KBGFJG347152-1 | 1 | $195,000 |
| Engineering Geologist - KBGFJG375666-1 | 1 | $90,000 |
| VP, Strategic Planning & Evaluations - KBGFJG206857-7 | 1 | $255,990 |
| Reliability Engineer/Specialist - KBGFJG390554-1 | 1 | $110,000 |
| Principal Advisor, Fixed Assets-KBGFJG387720-1 | 1 | $180,000 |
| Sr Mine Engineer - KBGFJG415488-1 | 1 | $131,477 |
| Sr Geotechnical Engineer - KBGFJG419164-1 | 1 | $155,000 |
| Manager, Metallurgy - KBGFJG300307-3 | 1 | $177,650 |
| Metallurgist I - KBGFJG314733-2 | 1 | $90,614 |
| Mine Surveyor - KBGFJG412439-1 | 1 | $74,880 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 2 | $194,400 |
| FY2025 | 5 | $195,000 |
| FY2026 | 7 | $131,477 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Mining and Geological Engineers, Including Mining Safety Engineers3
- Materials Engineers2
- Geoscientists, Except Hydrologists and Geographers2
- Financial Managers1
- General and Operations Managers1
- Training and Development Managers1
- Chief Executives1
- Mechanical Engineers1
- Regulatory Affairs Managers1
- Surveyors1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Metallurgist I - KBGFJG314733-2 | $90,614 Ìre I | Miami, AZ | 26 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Mine Surveyor - KBGFJG412439-1 | $74,880 Ìre III | Miami, AZ | 26 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Manager, Metallurgy - KBGFJG300307-3 | $177,650 E-3 · Ìre IV | Miami, AZ | 20 Gibl 2026 | 1 Lùna 2026 | Dearbhaichte |
| Sr Geotechnical Engineer - KBGFJG419164-1 | $155,000 H-1B1 (Sile) · Ìre IV | Miami, AZ | 13 Gibl 2026 | 1 Cèit 2026 | Dearbhaichte |
| Sr Mine Engineer - KBGFJG415488-1 | $131,477 H-1B1 (Sile) · Ìre IV | Miami, AZ | 6 Gibl 2026 | 15 Gibl 2026 | Dearbhaichte |
| Principal Advisor, Fixed Assets-KBGFJG387720-1 | $180,000 E-3 · Ìre IV | Miami, AZ | 25 Samh 2025 | 1 Gearr 2026 | Dearbhaichte |
| Reliability Engineer/Specialist - KBGFJG390554-1 | $110,000 H-1B1 (Sile) · Ìre III | Miami, AZ | 25 Samh 2025 | 1 Dùbh 2025 | Dearbhaichte |
| Engineering Geologist - KBGFJG375666-1 | $90,000 H-1B1 (Sile) · Ìre II | Miami, AZ | 23 Sult 2025 | 1 Dàmh 2025 | Dearbhaichte |
| VP, Strategic Planning & Evaluations - KBGFJG206857-7 | $255,990 E-3 · Ìre III | Gilbert, AZ | 31 Iuch 2025 | 4 Lùna 2025 | Dearbhaichte |
| Geologist - KBGFJG350298-1 | $103,100 Ìre III | Miami, AZ | 5 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Manager, Training & Culture - KBGFJG347152-1 | $195,000 E-3 · Ìre IV | Miami, AZ | 2 Gibl 2025 | 21 Gibl 2025 | Dearbhaichte |
| Chief Metallurgist - KBGFJG300307-1 | $145,000 E-3 · Ìre IV | Miami, AZ | 8 Iuch 2024 | 1 Lùna 2024 | Dearbhaichte |
| Mine General Manager - KBGFJG206857-5 | $243,800 E-3 · Ìre IV | Miami, AZ | 23 Cèit 2024 | 1 Lùna 2024 | Dearbhaichte |
| Commercial Manager - KBGFJG271199-1 | $210,000 E-3 · Ìre IV | Miami, AZ | 15 Gearr 2024 | 1 Màrt 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).