Dachaigh › Luchd-obrach › Piper Aircraft, Inc.
Piper Aircraft, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Piper Aircraft, Inc. 8 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 8. Tuarastal meadhanach a chaidh a thabhann: $103,101.
A bheil Piper Aircraft, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Piper Aircraft, Inc. 8 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 27 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Structural Analysis Engineer II | 1 | $90,000 |
| Senior Propulsion & Mechanical Engineer | 1 | $94,800 |
| Powerplant and Mechanical Systems Engineer I | 1 | $70,000 |
| Sr. Structural Analysis Engineer II | 1 | $128,423 |
| Senior Engineer, Liaison | 1 | $120,000 |
| Lead Engineer - Structural Analysis | 1 | $147,451 |
| Sr. Powerplant/Mechanical Systems Engineer | 1 | $111,402 |
| Powerplant & Mechanical Systems Engineer II | 1 | $94,146 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $90,000 |
| FY2024 | 2 | $124,212 |
| FY2025 | 1 | $147,451 |
| FY2026 | 2 | $102,774 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Powerplant & Mechanical Systems Engineer II | $94,146 Ìre II | Vero Beach, FL | 27 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Sr. Powerplant/Mechanical Systems Engineer | $111,402 | Vero Beach, FL | 6 Màrt 2026 | 1 Sult 2026 | Dearbhaichte |
| Lead Engineer - Structural Analysis | $147,451 Ìre IV | Vero Beach, FL | 23 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Senior Engineer, Liaison | $120,000 H-1B1 (Sile) · Ìre IV | Vero Beach, FL | 16 Sult 2024 | 30 Sult 2024 | Dearbhaichte |
| Sr. Structural Analysis Engineer II | $128,423–$135,000 | Vero Beach, FL | 30 Samh 2023 | 18 Dùbh 2023 | Dearbhaichte |
| Structural Analysis Engineer II | $90,000–$100,000 Ìre II | Vero Beach, FL | 14 Ògmh 2023 | 19 Ògmh 2023 | Dearbhaichte |
| Senior Propulsion & Mechanical Engineer | $94,800–$100,000 Ìre III | Vero Beach, FL | 25 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Powerplant and Mechanical Systems Engineer I | $70,000–$80,000 Ìre I | Melbourne, FL | 12 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).