Dachaigh › Luchd-obrach › Platinum Consulting Services, Inc.
Platinum Consulting Services, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Platinum Consulting Services, Inc. 17 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 14. Tuarastal meadhanach a chaidh a thabhann: $105,487.
A bheil Platinum Consulting Services, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Platinum Consulting Services, Inc. 17 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 13 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| .Net Developer | 5 | $101,327 |
| Azure Synapse Pipeline Developer | 3 | $114,400 |
| SAP PI-PO/CPI Technical Consultant | 2 | $109,200 |
| Software Developer | 2 | $97,822 |
| Tech Lead - Informatica | 1 | $101,290 |
| Sr. SQL Developer | 1 | $104,000 |
| SAP ABAP Technical Lead | 1 | $115,000 |
| Senior DevOps Engineer | 1 | $111,000 |
| Sr. Software Engineer | 1 | $95,680 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 8 | $112,700 |
| FY2024 | 7 | $105,487 |
| FY2025 | 1 | $91,645 |
| FY2026 | 1 | $95,680 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Sr. Software Engineer | $95,680 Ìre II | Carmel, IN | 13 Cèit 2026 | 21 Cèit 2026 | Dearbhaichte |
| Software Developer | $91,645 Ìre I | Charlotte, NC | 31 Dàmh 2024 | 8 Samh 2024 | Dearbhaichte |
| Software Developer | $104,000 Ìre II | Chicago, IL | 11 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Azure Synapse Pipeline Developer | $114,400 Ìre II | Durham, NC | 8 Màrt 2024 | 1 Cèit 2024 | Dearbhaichte |
| .Net Developer | $106,974 Ìre II | Charlotte, NC | 10 Faoi 2024 | 11 Màrt 2024 | Dearbhaichte |
| .Net Developer | $95,680 Ìre I | Charlotte, NC | 10 Faoi 2024 | 11 Màrt 2024 | Dearbhaichte |
| .Net Developer | $95,680 Ìre I | Charlotte, NC | 10 Faoi 2024 | 11 Màrt 2024 | Air a tharraing air ais |
| .Net Developer | $106,974 Ìre II | Charlotte, NC | 9 Faoi 2024 | 11 Màrt 2024 | Air a tharraing air ais |
| .Net Developer | $85,738 Ìre I | Charlotte, NC | 9 Faoi 2024 | 11 Màrt 2024 | Air a tharraing air ais |
| SAP PI-PO/CPI Technical Consultant | $104,000 Ìre II | Chicago, IL | 1 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| SAP PI-PO/CPI Technical Consultant | $114,400 Ìre II | Chicago, IL | 7 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Senior DevOps Engineer | $111,000 Ìre II | Durham, NC | 11 Iuch 2023 | 24 Iuch 2023 | Dearbhaichte |
| Azure Synapse Pipeline Developer | $114,400 Ìre II | Durham, NC | 31 Cèit 2023 | 1 Ògmh 2023 | Dearbhaichte |
| Azure Synapse Pipeline Developer | $114,400 Ìre II | Durham, NC | 31 Cèit 2023 | 1 Ògmh 2023 | Dearbhaichte |
| SAP ABAP Technical Lead | $115,000 Ìre III | Chicago, IL | 1 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Sr. SQL Developer | $104,000 Ìre II | Fort Mill, SC | 23 Faoi 2023 | 6 Gearr 2023 | Dearbhaichte |
| Tech Lead - Informatica | $101,290 Ìre II | Cary, NC | 3 Samh 2022 | 7 Samh 2022 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).