Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Populus Group LLC › Site Reliability Engineer

Site Reliability Engineer aig Populus Group LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Site Reliability Engineer aig Populus Group LLC. Tuarastal bunasach meadhanach $137,800; leth meadhanach $124,800–$197,600.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$137,800
Leath mheadhanach nan tuarastalan$124,800–$197,600
Ceudail 10mh–90mh$112,320–$197,600

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$197,600
FY20242$120,900
FY20251$124,800

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$124,800
Ìre II
Winston-Salem, NC8 Lùna 202518 Lùna 2025Dearbhaichte
$137,800
Ìre III
Columbus, OH28 Cèit 202410 Ògmh 2024Dearbhaichte
$104,000
Ìre II
Wilmington, DE15 Gibl 20241 Dàmh 2024Dearbhaichte
$197,600
Ìre III
Alameda, CA8 Lùna 202328 Lùna 2023Dearbhaichte
$197,600
Ìre III
Alameda, CA8 Lùna 202328 Lùna 2023Dearbhaichte

Site Reliability Engineer aig gach neach-fastaidh →

Obraichean eile aig Populus Group LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).