Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › R.E. Warner & Associates, Inc.

R.E. Warner & Associates, Inc.: Tuarastalan H-1B agus taic bhìosa

Chuir R.E. Warner & Associates, Inc. 12 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 12. Tuarastal meadhanach a chaidh a thabhann: $84,208.

Iarrtasan (LCAs)12
Dearbhaichte12
Seòladh an neach-fhastaidhNorth Olmsted, OH
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$84,208
Leath mheadhanach nan tuarastalan$73,658–$87,402
Ceudail 10mh–90mh$69,618–$103,240

A bheil R.E. Warner & Associates, Inc. a’ toirt taic do bhìosaichean H-1B?

Chuir R.E. Warner & Associates, Inc. 12 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 5 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Substation Engineer4$75,174
Senior Substation Engineer2$85,613
Project Manager, Electrical Substation1$105,000
Mechanical Engineer1$66,019
Electrical Substation Engineer1$75,005
Senior HVAC Engineer1$125,000
Substation Design Engineer1$82,804
Substation Project Manager1$87,403

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$105,000
FY20243$75,005
FY20254$77,616
FY20264$85,103

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Substation Design Engineer$82,804
Ìre II
North Olmsted, OH5 Cèit 20261 Dàmh 2026Dearbhaichte
Substation Project Manager$87,403
Ìre II
North Olmsted, OH5 Cèit 20261 Dàmh 2026Dearbhaichte
Substation Engineer$80,730
Ìre I
North Olmsted, OH5 Cèit 20261 Dàmh 2026Dearbhaichte
Substation Engineer$87,402
Ìre II
North Olmsted, OH23 Gearr 20263 Màrt 2026Dearbhaichte
Senior Substation Engineer$85,613
Ìre II
North Olmsted, OH25 Gibl 20251 Dàmh 2025Dearbhaichte
Substation Engineer$69,618
Ìre I
North Olmsted, OH25 Gibl 20251 Dàmh 2025Dearbhaichte
Senior Substation Engineer$85,613
Ìre II
North Olmsted, OH25 Gibl 20251 Dàmh 2025Dearbhaichte
Substation Engineer$69,618
Ìre I
North Olmsted, OH25 Gibl 20251 Dàmh 2025Dearbhaichte
Electrical Substation Engineer$75,005
Ìre I
North Olmsted, OH11 Gibl 20241 Dàmh 2024Dearbhaichte
Mechanical Engineer$66,019
Ìre I
Westlake, OH11 Gibl 20241 Dàmh 2024Dearbhaichte
Senior HVAC Engineer$125,000
Ìre III
Canton, MI10 Gibl 202415 Gibl 2024Dearbhaichte
Project Manager, Electrical Substation$105,000
Ìre II
Westlake, OH17 Cèit 20231 Ògmh 2023Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).