Dachaigh › Luchd-obrach › Reliable Controls Corporation
Reliable Controls Corporation: Tuarastalan H-1B agus taic bhìosa
Chuir Reliable Controls Corporation 12 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 11. Tuarastal meadhanach a chaidh a thabhann: $135,200.
A bheil Reliable Controls Corporation a’ toirt taic do bhìosaichean H-1B?
Chuir Reliable Controls Corporation 12 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 16 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Process Controls Engineer V | 3 | $136,916 |
| Process Controls Engineer IV | 2 | $130,520 |
| Commissioning Supervisor II | 1 | $156,000 |
| Process Engineer IV/Metallurgical | 1 | $132,000 |
| Director of Business Development | 1 | $140,000 |
| Process Controls Engineer | 1 | $91,749 |
| Deputy Director Commissioning | 1 | $180,000 |
| Commissioning Supervisor I | 1 | $156,000 |
| Area Test Engineer V | 1 | $134,014 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 5 | $135,200 |
| FY2024 | 2 | $135,874 |
| FY2025 | 4 | $138,632 |
| FY2026 | 1 | $134,014 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Area Test Engineer V | $134,014 Ìre IV | Salt Lake City, UT | 16 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Process Controls Engineer V | $138,632 Ìre IV | Salt Lake City, UT | 19 Dùbh 2024 | 1 Màrt 2025 | Dearbhaichte |
| Process Controls Engineer V | $138,632 Ìre IV | Salt Lake City, UT | 19 Dùbh 2024 | 1 Màrt 2025 | Air a tharraing air ais |
| Process Controls Engineer V | $135,200 Ìre II | Salt Lake City, UT | 20 Samh 2024 | 1 Màrt 2025 | Dearbhaichte |
| Commissioning Supervisor I | $156,000 Ìre IV | Salt Lake City, UT | 22 Dàmh 2024 | 1 Samh 2024 | Dearbhaichte |
| Deputy Director Commissioning | $180,000 Ìre IV | Salt Lake City, UT | 23 Iuch 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Process Controls Engineer | $91,749 Ìre I | Salt Lake City, UT | 3 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Director of Business Development | $140,000 Ìre III | Salt Lake City, UT | 19 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Process Controls Engineer IV | $125,840 Ìre II | Salt Lake City, UT | 6 Sult 2023 | 29 Sult 2023 | Dearbhaichte |
| Process Engineer IV/Metallurgical | $132,000 Ìre IV | Salt Lake City, UT | 21 Iuch 2023 | 1 Dàmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Commissioning Supervisor II | $156,000 Ìre IV | Salt Lake City, UT | 21 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Process Controls Engineer IV | $135,200 Ìre II | Salt Lake City, UT | 21 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).