Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Remitly, Inc. › Engineering Manager

Engineering Manager aig Remitly, Inc.: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Engineering Manager aig Remitly, Inc.. Tuarastal bunasach meadhanach $220,000; leth meadhanach $212,250–$224,489.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$220,000
Leath mheadhanach nan tuarastalan$212,250–$224,489
Ceudail 10mh–90mh$188,348–$233,684

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$220,000
FY20243$189,000
FY20252$225,192

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$226,600
Ìre III
Seattle, WA20 Dùbh 20241 Ògmh 2025Dearbhaichte
$223,785
Ìre III
Seattle, WA17 Dùbh 20241 Ògmh 2025Dearbhaichte
$186,828
Ìre IV
Seattle, WA23 Cèit 202413 Sult 2024Dearbhaichte
$250,212
Ìre IV
Seattle, WA8 Màrt 202428 Ògmh 2024Dearbhaichte
$189,000
Ìre IV
Seattle, WA5 Màrt 20241 Gibl 2024Dearbhaichte
$220,000
Ìre IV
Seattle, WA28 Dùbh 20223 Faoi 2023Dearbhaichte
$220,000
Ìre IV
Seattle, WA6 Dùbh 202219 Dùbh 2022Dearbhaichte
$220,000
Ìre II
Seattle, WA27 Dàmh 202211 Samh 2022Dearbhaichte

Engineering Manager aig gach neach-fastaidh →

Obraichean eile aig Remitly, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).