Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › RingCentral, Inc. › Group Product Manager

Group Product Manager aig RingCentral, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Group Product Manager aig RingCentral, Inc.. Tuarastal bunasach meadhanach $236,810; leth meadhanach $220,000–$251,576.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$236,810
Leath mheadhanach nan tuarastalan$220,000–$251,576
Ceudail 10mh–90mh$214,000–$251,576

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20253$251,576
FY20262$223,405

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$236,810
Ìre IV
Belmont, CA20 Gibl 20261 Dàmh 2026Dearbhaichte
$210,000
Ìre III
Belmont, CA10 Màrt 202630 Màrt 2026Dearbhaichte
$220,000
Ìre IV
Belmont, CA18 Cèit 20259 Ògmh 2025Dearbhaichte
$251,576
Ìre IV
North Bend, WA8 Gibl 20251 Dàmh 2025Dearbhaichte
$251,576
E-3 · Ìre IV
North Bend, WA26 Samh 20243 Cèit 2025Dearbhaichte

Group Product Manager aig gach neach-fastaidh →

Obraichean eile aig RingCentral, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).