Dachaigh › Luchd-obrach › Rondo Energy, Inc.
Rondo Energy, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Rondo Energy, Inc. 16 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 15. Tuarastal meadhanach a chaidh a thabhann: $170,000.
A bheil Rondo Energy, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Rondo Energy, Inc. 16 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 19 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Director of Quality | 2 | $170,000 |
| Senior Global Supply Manager, Electrical Systems | 2 | $170,000 |
| Senior Reliability Test Engineer | 2 | $170,000 |
| Senior Construction Project Manager | 1 | $160,000 |
| Chief Operations Officer | 1 | $290,000 |
| Senior Vice President of Commercial Strategy | 1 | $290,000 |
| Mechanical Engineer | 1 | $135,000 |
| Senior Project Manager | 1 | $132,288 |
| Mechanical Engineer II | 1 | $145,000 |
| Product Manager | 1 | $170,000 |
| Senior Test Engineer | 1 | $162,000 |
| Staff Mechanical Engineer | 1 | $202,000 |
| Director, Construction | 1 | $200,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $160,000 |
| FY2024 | 6 | $170,000 |
| FY2025 | 5 | $170,000 |
| FY2026 | 4 | $185,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Mechanical Engineers4
- Construction Managers2
- Industrial Engineers2
- Chief Executives1
- Marketing Managers1
- Project Management Specialists1
- Electrical Engineers1
- Architectural and Engineering Managers1
- Purchasing Managers1
- Software Quality Assurance Analysts and Testers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Senior Reliability Test Engineer | $170,000 Ìre IV | Alameda, CA | 19 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Senior Reliability Test Engineer | $170,000 Ìre IV | Alameda, CA | 19 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Director, Construction | $200,000–$225,000 Ìre IV | Riverside, CA | 20 Gibl 2026 | 18 Cèit 2026 | Dearbhaichte |
| Staff Mechanical Engineer | $202,000–$235,500 Ìre IV | Alameda, CA | 16 Dùbh 2025 | 5 Faoi 2026 | Dearbhaichte |
| Senior Global Supply Manager, Electrical Systems | $170,000 Ìre III | Alameda, CA | 18 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Senior Global Supply Manager, Electrical Systems | $170,000 Ìre II | Alameda, CA | 14 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Mechanical Engineer II | $145,000 Ìre II | Alameda, CA | 14 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Product Manager | $170,000 Ìre I | Brooklyn, NY | 14 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Senior Test Engineer | $162,000 Ìre III | Alameda, CA | 6 Cèit 2025 | 2 Ògmh 2025 | Dearbhaichte |
| Senior Project Manager | $132,288–$142,288 Ìre III | Alameda, CA | 18 Sult 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Chief Operations Officer | $290,000–$310,000 | Alameda, CA | 18 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Senior Vice President of Commercial Strategy | $290,000–$310,000 Ìre IV | Alameda, CA | 17 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Mechanical Engineer | $135,000 Ìre I | Alameda, CA | 25 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Director of Quality | $170,000–$190,000 Ìre IV | Alameda, CA | 10 Dàmh 2023 | 6 Samh 2023 | Dearbhaichte |
| Director of Quality | $170,000–$190,000 Ìre IV | Alameda, CA | 10 Dàmh 2023 | 6 Samh 2023 | Air a tharraing air ais |
| Senior Construction Project Manager | $160,000 Ìre IV | Riverside, CA | 10 Cèit 2023 | 18 Cèit 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).